10 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · January 23, 1985
C. E. Fry to D. D. Templeton Transmitting 1983-1984 Asbestos Monitoring Data, South Charleston Plant 514 (1985)
Internal memo dated January 23, 1985 transmitting all asbestos measurements made in 1983 and 1984 at the South Charleston plant. It explains the blank job-class entries and the 1.00 eight-hour TWA values, and attaches computer printouts of…
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to D. R. Paugh and Others on Asbestos Air Monitoring at the South Charleston Plant (1977)
Internal Union Carbide memo reporting air sampling done on August 8, 1977 during removal of wet insulation, possibly containing asbestos, from a furnace at the South Charleston mainland powerhouse. It states that the results complied with…
-
Company document · Union Carbide documents · January 23, 1985
C. E. Fry to D. D. Templeton on Asbestos Measurements Made in 1983 and 1984 (1985)
One-page internal Union Carbide memo from C. E. Fry to D. D. Templeton, sent with an attachment of the asbestos measurements made in 1983 and 1984. It explains how to read the 'Job Class. Code…
-
Company document · Union Carbide documents · August 23, 1976
B. L. Murray to J. H. Murray on Potential Asbestos Exposure from South Charleston Plant Storeroom Materials, with Attached Data Sheet and Plant Stores Sampling Report (1976)
…H. Murray on potential asbestos exposure in plant storerooms (Buildings 307-1 and 8-505) Union Carbide Chemicals and Plastics Division Environmental Health Data Sheet for asbestos (chrysotile), South Charleston Plant Industrial hygiene memo dated July…
-
Company document · Union Carbide documents · 1986
Asbestos Handling and Asbestos Removal/Disposal Checklists for Insulation Removal Jobs, East Tank Farm and Other Plant Areas (1985-1986)
A set of plant checklist forms recording jobs in which asbestos insulation was removed, mostly in May and June 1986, with a few forms dated May 1985. Each form gives the date, job description, estimated quantity removed, location (for example Area…
-
Company document · Union Carbide documents · July 14, 1983
Bill Young to Maintenance Area Superintendents Forwarding OSHA Plans Asbestos Exposure Limit Reduction Report (1983)
A one-page Union Carbide South Charleston Plant internal memo transmitting an attached Occupational Safety & Health Reporter article on OSHA's plans to lower the asbestos exposure limit. The attached BNA report (July 7, 1983) states…
-
Company document · Union Carbide documents · May 22, 1985
A. E. Wood to All Department Heads on Use of Non-Asbestos Gaskets at South Charleston (1985)
Memorandum from A. E. Wood reporting that the GR shop had used non-asbestos gaskets on pump heads since 1983 to decrease asbestos exposure, and that inspected non-asbestos gaskets showed binder attack by process chemicals. It sets out an action plan…
-
Company document · Union Carbide documents · May 15, 1985
D. J. McNeil to W. E. Ballard and Others on Use of Asbestos/Non-Asbestos Gasket and Valve Packing Materials at South Charleston (1985)
Memorandum reporting a 5/10/85 meeting on use of asbestos and non-asbestos gasket and valve packing materials at the South Charleston location. It records the earlier effort to discontinue asbestos materials after the health concern, the E&TS…
-
Company document · Union Carbide documents · November 2, 1983
C. R. Gillespie to T. G. Swanson on Removal of Asbestos-Covered 3-Inch Line, Building 303 (1983)
Internal memo describing conditions found during removal of an asbestos-insulated 3-inch pipe line in Building 303, including that asbestos was left on the floor after the pipe was rigged out. It recommends changes to Maintenance Safety Procedures,…