No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

31 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents

    Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)

    Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…

  2. Company document · Union Carbide documents · 1986

    West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)

    …Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…

  3. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  4. Company document · Union Carbide documents · April 1, 1987

    R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)

    One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…

  5. Company document · Union Carbide documents · November 29, 1983

    Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)

    A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…

  6. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  7. Company document · Union Carbide documents · January 15, 1986

    Cathy Wells to B. R. McMakin and R. W. Scoular Forwarding Tom Collins' Asbestos Removal Letter and Attachment (1986)

    A short cover memo stating that the attachment to Tom Collins' January 8, 1986 letter regarding asbestos removal had been left out of the envelope. The letter was reprinted and enclosed with the attachment. The memo carries a Safety Dept. received…

  8. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  9. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  10. Company document · Union Carbide documents · April 23, 1986

    Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)

    Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…

  11. Company document · Union Carbide documents · March 17, 1987

    Manhar A. Patel to B. R. McMakin on Asbestos Medical Surveillance and Preassignment Examinations (1987)

    Internal Union Carbide memo from Manhar A. Patel to B. R. McMakin about whether the company's plan of giving employees medical exams in their birthday month meets the preassignment medical surveillance requirements of the OSHA…

  12. Company document · Union Carbide documents · January 8, 1986

    T. L. Collins to B. R. McMakin and R. W. Scoular on EPA Enforcement of Asbestos Removal Regulations (1986)

    Internal Union Carbide Technical Center memo transmitting an item from the January 3, 1986 issue of Inside EPA on enforcement of asbestos removal regulations. The memo said EPA was apparently giving high priority to monitoring asbestos…

  13. Company document · Union Carbide documents · October 7, 1986

    R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)

    Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…

  14. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  15. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  16. Company document · Union Carbide documents · January 21, 1987

    Manhar A. Patel to B. H. Avashia, M.D. and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)

    Internal Union Carbide memo from Manhar A. Patel transmitting the respiratory protection and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement jobs. It discusses medical questionnaires, six-month respirator fit tests, training, and…

  17. Company document · Union Carbide documents · September 18, 1987

    Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)

    Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…

  18. Company document · Union Carbide documents · May 21, 1987

    M. A. Patel to B. R. McMakin and R. W. Scoular transmitting Draft Asbestos Containing Material Removal and Handling Procedure (1987)

    Internal Union Carbide Technical Center memo from Manhar A. Patel transmitting a draft procedure for removal and handling of asbestos-containing material and asking recipients to review it and adopt it in their department safety and…

  19. Company document · Union Carbide documents · January 21, 1987

    Manhar A. Patel to B. H. Avashia, M.D., and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)

    A two-page Union Carbide internal memo of January 21, 1987, from Manhar A. Patel to medical, safety and engineering staff, forwarding the respirator and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement…

  20. Company document · Union Carbide documents · April 16, 1986

    V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)

    Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…