24 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · January 15, 1986
Cathy Wells to B. R. McMakin and R. W. Scoular Forwarding Tom Collins' Asbestos Removal Letter and Attachment (1986)
A short cover memo stating that the attachment to Tom Collins' January 8, 1986 letter regarding asbestos removal had been left out of the envelope. The letter was reprinted and enclosed with the attachment. The memo carries a Safety Dept. received…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · October 6, 1986
V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…
-
Company document · Union Carbide documents · March 17, 1987
Manhar A. Patel to B. R. McMakin on Asbestos Medical Surveillance and Preassignment Examinations (1987)
Internal Union Carbide memo from Manhar A. Patel to B. R. McMakin about whether the company's plan of giving employees medical exams in their birthday month meets the preassignment medical surveillance requirements of the OSHA…
-
Company document · Union Carbide documents · January 8, 1986
T. L. Collins to B. R. McMakin and R. W. Scoular on EPA Enforcement of Asbestos Removal Regulations (1986)
Internal Union Carbide Technical Center memo transmitting an item from the January 3, 1986 issue of Inside EPA on enforcement of asbestos removal regulations. The memo said EPA was apparently giving high priority to monitoring asbestos…
-
Company document · Union Carbide documents · October 7, 1986
R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)
Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…
-
Company document · Union Carbide documents · January 21, 1987
Manhar A. Patel to B. H. Avashia, M.D. and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)
Internal Union Carbide memo from Manhar A. Patel transmitting the respiratory protection and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement jobs. It discusses medical questionnaires, six-month respirator fit tests, training, and…
-
Company document · Union Carbide documents · September 18, 1987
Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)
Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…
-
Company document · Union Carbide documents · May 21, 1987
M. A. Patel to B. R. McMakin and R. W. Scoular transmitting Draft Asbestos Containing Material Removal and Handling Procedure (1987)
Internal Union Carbide Technical Center memo from Manhar A. Patel transmitting a draft procedure for removal and handling of asbestos-containing material and asking recipients to review it and adopt it in their department safety and…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · January 21, 1987
Manhar A. Patel to B. H. Avashia, M.D., and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)
A two-page Union Carbide internal memo of January 21, 1987, from Manhar A. Patel to medical, safety and engineering staff, forwarding the respirator and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Correction to Asbestos Monitoring in Gasket Shop, 512 Construction (1981)
A one-page internal memo stating that the writer's October 20, 1981 letter on asbestos monitoring in the Gasket Shop (512 Construction) contained an error caused by misinterpreting data from the 512 Industrial Hygiene group. It asks recipients to…
-
Company document · Union Carbide documents · April 16, 1986
V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)
Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…
-
Company document · Union Carbide documents · July 23, 1987
Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)
Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Institute Plant Gasket Shop (1981)
Internal memo from Manhar A. Patel reporting area and personal asbestos air monitoring in the Construction Department gasket shop at the Institute Plant on October 2 and 9, 1981, with a results table attached. The memo says exposures above the 2…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · October 20, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal Union Carbide memo transmitting results of area and personal asbestos air monitoring in the Construction Department gasket shop at the Institute Plant, sampled October 2 and 9, 1981. The memo states that exposure above the…