44 results for “Union Carbide Corporation”, page 1 of 3
-
Company document · Union Carbide documents
Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · November 29, 1983
Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)
A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · November 22, 1985
G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)
Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…
-
Company document · Union Carbide documents · April 4, 1983
H. C. Lewinsohn to John Cornell on Recording and Reporting of Asbestos-Related Radiographic Abnormalities, with Attached OSHA Recordkeeping Instructions and 1979 Raybestos-Manhattan Surveillance Paper (1983)
Internal Union Carbide memo in which H. C. Lewinsohn followed up a March 29, 1983 Charleston meeting on classifying asbestos-related chest x-ray abnormalities for record-keeping. He attached OSHA recordkeeping instructions he had prepared…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · October 6, 1986
V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…
-
Company document · Union Carbide documents · December 12, 1984
M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)
Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…
-
Company document · Union Carbide documents · May 16, 1985
M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)
Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…
-
Company document · Union Carbide documents · October 7, 1986
R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)
Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…
-
Company document · Union Carbide documents · March 30, 1983
J. S. Cornell to B. H. Avashia and Others on Asbestos-Related Medical Issues and OSHA 200 Log Recording (1983)
Internal memo from the Safety & Health department summarizing a March 29, 1983 South Charleston meeting on asbestos-related medical issues. It covers chest X-ray review, recording of asbestos-related abnormalities on the OSHA 200 Log, and follow-up…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…