  1. Company document · Union Carbide documents

    Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)

    Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…

  2. Company document · Union Carbide documents · 1986

    West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)

    …Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…

  3. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  4. Company document · Union Carbide documents · April 1, 1987

    R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)

    One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…

  5. Company document · Union Carbide documents · December 20, 1983

    Industrial Hygiene Monitoring for Asbestos: M. F. Stowers and M. A. Patel to W. T. Shelton, Personal Samples of Two Insulators in Bldg. 707 Cell 11 (1983)

    Two industrial hygiene monitoring reports for asbestos, dated Dec. 20, 1983 (Computer Ref W-1508), covering personal samples taken 11/10/83 in Bldg. 707 Cell 11, first level. One sample for R. P. Hess measured 0.07 fibers/cc over 30 minutes, and one…

  6. Company document · Union Carbide documents · May 3, 1985

    M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)

    Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…

  7. Company document · Union Carbide documents · November 29, 1983

    Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)

    A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…

  8. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  9. Company document · Union Carbide documents

    Fred Williams to J. M. Butcher, M. E. Perry and C. L. Ruddle on Asbestos Sampling in Compliance with OSHA (undated)

    A one-page Union Carbide memo from Fred Williams to three recipients about asbestos sampling under the OSHA regulation. It states that sampling could not be done as the regulation required under the existing informal notification…

  10. Company document · Union Carbide documents · July 23, 1986

    Industrial Hygiene (V. E. Stover and M. A. Patel) to O. R. Hay and Others on Asbestos Exposure Monitoring of R. E. Smith in the 701 Basement (1986)

    Internal Union Carbide memo transmitting the results of personal asbestos air monitoring of employee R. E. Smith, who was shredding paper in the 701 basement on July 1, 1986. The monitoring was requested because of concern…

  11. Company document · Union Carbide documents · July 24, 1986

    V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring in Building 770 (1986)

    Internal Union Carbide memo reporting asbestos air monitoring on June 23, 1986 in Building 770 while two employees removed about 15 feet of asbestos insulation from a steam line in an air handler. It states the…

  12. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  13. Company document · Union Carbide documents · April 23, 1986

    Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)

    Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…

  14. Company document · Union Carbide documents · August 28, 1987

    Vance E. Stover and Manhar A. Patel to A. F. Terry on Asbestos Exposure Monitoring of Insulators and Carpenters in Building 701 (1987)

    Internal Union Carbide memo reporting asbestos exposure monitoring of two insulators and two carpenters during asbestos stripping and enclosure moving in Building 701 on August 17-21, 1987. It states that insulator results were above the…

  15. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  16. Company document · Union Carbide documents · November 9, 1979

    G. W. Bott to M. E. Perry on Asbestos Exposure from Sawing Transite Board on the DoAll Saw, Bldg. 704 Machine Shop (1979)

    Internal industrial hygiene report on an October 30, 1979 survey of asbestos exposure while a machinist sawed transite (asbestos-containing) board on a DoAll saw in the Building 704 machine shop at South Charleston, West Virginia. It reports sample…

  17. Company document · Union Carbide documents · March 11, 1988

    T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)

    A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…

  18. Company document · Union Carbide documents · October 7, 1986

    A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)

    Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…

  19. Company document · Union Carbide documents · February 1, 1982

    M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)

    Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…

  20. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…