No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

67 results for “Union Carbide Corporation”, page 1 of 4

  1. Company document · Union Carbide documents · October 15, 1973

    L. L. Bissett to C. W. Carman on the 1973 Asbestosis Survey (1973)

    Memo confirming a morning discussion about Dr. Sexton's October 5 report on the 1973 asbestosis survey. It states that asbestos is handled in small quantities, mainly in tearing into existing insulation, and lists steps agreed: a review of controls…

  2. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)

    Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…

  3. Company document · Union Carbide documents · April 4, 1983

    T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)

    A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…

  4. Company document · Union Carbide documents · March 8, 1979

    Handwritten Memo to C. W. Carman on March 2 Meeting about Asbestos Exposure Compliance (1979)

    A one-page handwritten memo dated March 8, 1979, to C. W. Carman. The writer reports that he and a Mr. Shipley met with "George" on Friday, March 2, to discuss concerns about asbestos exposure. The memo says they asked for work and discussion on…

  5. Company document · Union Carbide documents · March 8, 1979

    Handwritten Memo from Randy [surname illegible] to C. W. Carman on Meeting About Asbestos Exposure Concerns (1979)

    A handwritten memo on a company memo form, dated March 8, 1979. The writer tells C. W. Carman that he and a Mr. Shipley met with "George" on Friday, March 2 to discuss their concerns about asbestos exposure. They asked George to come and discuss…

  6. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  7. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  8. Company document · Union Carbide documents · January 1983

    Mario Gutierrez Safety Audit Forms for Maintenance (Hearing Conservation, Hearing Protection, Noise) and Stores (Detector Tubes) (1983)

    Set of completed safety audit forms dated January 1983. It includes a Share Audit Procedure form on Hearing Conservation for Maintenance, Hearing Protection and Noise inspection checklists for Maintenance, and a Detector Tubes expiration audit for…

  9. Company document · Union Carbide documents · February 1, 1983

    Share Audit Procedure and Chemical Inspection Audit Forms for Chlorothene Handling and Chemical System Inventory, Energy/Oxygen Department (1983)

    Six pages of completed safety audit forms from 1983: a Share Audit Procedure sheet for the chlorothene handling procedure, a Chlorothene Handling Inspection and Audit checklist for Building 364, and Chemical System Inventory Inspection and Audit…

  10. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  11. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…

  12. Company document · Union Carbide documents · August 14, 1978

    E. R. Levy Memo on Orientation for Personnel Safety and Health Training Package Preparers, with L. S. Slaughter Memo and Engineering Department Training Team Report (1978)

    The exhibit holds two Union Carbide Engineering memoranda from August 1978 and attachments from a report of the Engineering Department's personnel safety and health training task team. E. R. Levy's memo of August 14…

  13. Company document · Union Carbide documents · August 25, 1977

    W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Air Sampling During Insulation Removal at Institute Powerhouse (1977)

    Internal memo reporting air samples taken August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample concentrations of 2.59 and 2.61 fibers/cc and an area sample…

  14. Company document · Union Carbide documents · March 2, 1983

    Share Audit Procedure and Chlorothene Handling Inspection and Audit, Linde Department, by Mario Gutierrez (1983)

    Two-page set of audit forms dated March 2, 1983, for the Linde department. The first is a Share Audit Procedure form on chlorothene handling, with one person interviewed and mostly yes answers. The second is a Chlorothene Handling Inspection and…

  15. Company document · Union Carbide documents · 1981

    Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (1981)

    A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated fourth quarter 1981, with a ventilation inspection and audit checklist for a lab hood in Building 522 Recovery. The audit form marked no deficiency and…

  16. Company document · Union Carbide documents · November 7, 1978

    K. Gran Townsend to A. L. Barefoot, R. H. Chase, L. T. Windel/K. A. Windhorst and J. L. Wyatt Transmitting the 1978 Brownsville Plant Ventilation Survey (1978)

    Internal Union Carbide correspondence from the Brownsville, Texas plant transmitting a copy of the semi-annual 1978 OSHA-required ventilation survey. The memo says the survey addresses dust collector and fume hood performance and recommendations for…

  17. Company document · Union Carbide documents · August 25, 1977

    W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Monitoring at the Institute Powerhouse (1977)

    Internal memo reporting air sampling on August 15, 1977 during removal of insulation possibly containing asbestos at the Institute, West Virginia powerhouse. It reports two personal samples (2.59 and 2.61 fibers/cc) and one area sample (0.48…

  18. Company document · Union Carbide documents · October 20, 1981

    M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)

    Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…

  19. Company document · Union Carbide documents · January 18, 1983

    Reaction Department Share Audit and Noise, Hearing Protection and Detector Tube Inspection Forms Completed by Mario Gutierrez (1983)

    Set of January 1983 audit and inspection forms for the Reaction department. It includes a Share Audit Procedure sheet on hearing conservation and detector tubes, noise and hearing protection inspections for Reaction #1 and #2, and detector tube…

  20. Company document · Union Carbide documents · October 2, 1978

    E. R. Levy to C. W. Carman and Others on Review Meeting of Personnel Safety and Health Training Packages (1978)

    A one-page memorandum from E. R. Levy summarizing a September 25, 1978 review meeting at which attendees presented preliminary outlines of their Personnel Safety and Health Training packages. It records agreement to proceed with preparing the…