Company document · Union Carbide documents · October 15, 1973
L. L. Bissett to C. W. Carman on the 1973 Asbestosis Survey (1973)
Memo confirming a morning discussion about Dr. Sexton's October 5 report on the 1973 asbestosis survey. It states that asbestos is handled in small quantities, mainly in tearing into existing insulation, and lists steps agreed: a review of controls…
-
Company document · Union Carbide documents · August 1980
Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)
Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…
-
Company document · Union Carbide documents · April 4, 1983
T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)
A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…
-
Company document · Union Carbide documents · December 20, 1983
Industrial Hygiene Monitoring for Asbestos: M. F. Stowers and M. A. Patel to W. T. Shelton, Personal Samples of Two Insulators in Bldg. 707 Cell 11 (1983)
Two industrial hygiene monitoring reports for asbestos, dated Dec. 20, 1983 (Computer Ref W-1508), covering personal samples taken 11/10/83 in Bldg. 707 Cell 11, first level. One sample for R. P. Hess measured 0.07 fibers/cc over 30 minutes, and one…
-
Company document · Union Carbide documents · April 20, 1983
Industrial Hygiene Monitoring for Asbestos: J. W. Greenlee Stripping Insulation from Hot Water Tank, to W. T. Shelton (1983)
Union Carbide industrial hygiene monitoring form reporting a 33-minute air sample taken April 6, 1983 on J. W. Greenlee in Building 709 while he stripped insulation from an old hot water tank. It records a…
-
Company document · Union Carbide documents · March 8, 1979
Handwritten Memo to C. W. Carman on March 2 Meeting about Asbestos Exposure Compliance (1979)
A one-page handwritten memo dated March 8, 1979, to C. W. Carman. The writer reports that he and a Mr. Shipley met with "George" on Friday, March 2, to discuss concerns about asbestos exposure. The memo says they asked for work and discussion on…
-
Company document · Union Carbide documents · May 3, 1985
M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)
Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…
-
Company document · Union Carbide documents · August 5, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…
-
Company document · Union Carbide documents · March 8, 1979
Handwritten Memo from Randy [surname illegible] to C. W. Carman on Meeting About Asbestos Exposure Concerns (1979)
A handwritten memo on a company memo form, dated March 8, 1979. The writer tells C. W. Carman that he and a Mr. Shipley met with "George" on Friday, March 2 to discuss their concerns about asbestos exposure. They asked George to come and discuss…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · September 2, 1982
Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)
Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…
-
Company document · Union Carbide documents · July 23, 1986
Industrial Hygiene (V. E. Stover and M. A. Patel) to O. R. Hay and Others on Asbestos Exposure Monitoring of R. E. Smith in the 701 Basement (1986)
Internal Union Carbide memo transmitting the results of personal asbestos air monitoring of employee R. E. Smith, who was shredding paper in the 701 basement on July 1, 1986. The monitoring was requested because of concern…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · December 5, 1978
G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)
A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…
-
Company document · Union Carbide documents · July 24, 1986
V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring in Building 770 (1986)
Internal Union Carbide memo reporting asbestos air monitoring on June 23, 1986 in Building 770 while two employees removed about 15 feet of asbestos insulation from a steam line in an air handler. It states the…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · August 14, 1978
E. R. Levy Memo on Orientation for Personnel Safety and Health Training Package Preparers, with L. S. Slaughter Memo and Engineering Department Training Team Report (1978)
The exhibit holds two Union Carbide Engineering memoranda from August 1978 and attachments from a report of the Engineering Department's personnel safety and health training task team. E. R. Levy's memo of August 14…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…