6 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 27, 1980
W. F. Blythe, Jr. to J. R. Hall on Asbestos Monitoring of Construction Employees at the South Charleston Plant (1980)
Internal correspondence reporting a March 20, 1980 survey of Construction employees who removed asbestos pipe insulation near Building 103 at the South Charleston plant. It reported personal-sampler results for one insulator and one laborer,…
-
Company document · Union Carbide documents · June 21, 1979
L. R. Noble Memo to D. E. Raines on Safety Inspection of the Insulation Fabrication Shop, Building 2018, with Handwritten Follow-up Notes (1979)
…Randy Noble, responding to inspection items #2, #3 and #4 (Industrial Hygiene dust evaluation, replacing the protective pole, 15 mg/m3 nuisance dust limit and respirator use) Typed Union Carbide memo, June 21, 1979, L. R…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to D. E. Raines on Dust and Chemicals Exposure Monitoring in the Insulation Shop, Building 2018 (1984)
Memorandum reporting a March-April 1984 Technical Center industrial hygiene survey of dust and chemical exposures in the Insulation Shop, Building 2018. It states that dust, benzene-soluble particulate, and chemical results were generally below…
-
Company document · Union Carbide documents · February 1, 1982
M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)
Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…
-
Company document · Union Carbide documents · April 16, 1980
Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)
Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…
-
Company document · Union Carbide documents · November 18, 1981
M. A. Patel to P. P. Price and D. E. Raines on Dust Monitoring in the Institute Plant Insulation Shop (1981)
Internal correspondence reporting October 1981 airborne dust monitoring in the Institute Plant Construction Department insulation shop, where KAYLO-10 and perlite insulation blocks were sawed and handled. The memo says air levels were generally…