No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

20 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · 1987

    Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)

    …Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…

  2. Company document · Union Carbide documents · May 1987

    Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)

    Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…

  3. Company document · Union Carbide documents · June 30, 1987

    Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)

    Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…

  4. Company document · Union Carbide documents · March 25, 1983

    Industrial Hygiene Results: Insulation Sampling on Water Tank T-1098, Esters Area, by H. G. Kuntz and K. E. Williams (1983)

    One-page industrial hygiene report dated March 25, 1983, on samples of loose and rigid insulation taken on March 23, 1983 from water tank T-1098 near the Esters tower. Chemical microscopy found no asbestos in either sample, and the report…

  5. Company document · Union Carbide documents · May 28, 1987

    D. Liebeskind to L. W. Phair on Asbestos Orientation for Sistersville Plant Workers, with Asbestos Abatement Brochure (1987)

    …would conduct an asbestos orientation for workers at the Sistersville plant for about $1000/day plus expenses. The memo asks for the Union's views and attaches a brochure, 'Asbestos Abatement: Doin' It Right – Work Practices'…

  6. Company document · Union Carbide documents · May 7, 1987

    G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)

    Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…

  7. Company document · Union Carbide documents · November 7, 1986

    D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)

    Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…

  8. Company document · Union Carbide documents · October 29, 1986

    W. V. Summers to D. Liebeskind on the Sistersville Asbestos Insulation Upgrade Project (1986)

    Memo dated October 29, 1986 from W. V. Summers at the Sistersville, WV plant to D. Liebeskind, with copies to six others, giving comments on the plant's asbestos insulation upgrade project. It describes damaged installed asbestos insulation as the…

  9. Company document · Union Carbide documents · February 17, 1986

    L. W. Widdecombe Jr. (Plastic Coatings Corp.) to Tammy Grittie on Asbestos in JAXSAN 600, with Enclosures and Sistersville Memo on Jaxsan-600 (1986)

    …17, 1986, L. W. Widdecombe Jr., Plastic Coatings Corporation, to Tammy Grittie, Union Carbide, Sistersville, enclosing regulatory material on asbestos in coatings and binders Federal Register excerpt (29 CFR 1910.1001, p. 607) on asbestos monitoring…

  10. Company document · Union Carbide documents · June 20, 1987

    Industrial Hygiene Monitoring Report on Asbestos Exposure Concern in the Monomers Control Room, by C. R. McMillan and T. L. Grittie (1987)

    One-page industrial hygiene monitoring report dated June 20, 1987, on an area air sample taken 2/13/87 in the Monomers control room after loose insulation fell onto the roof near the ventilation intake. The sample result was

  11. Company document · Union Carbide documents · February 6, 1987

    W. V. Summers to D. G. Beddow, K. F. Carroll and L. W. Phair on Asbestos Removal Strategy at the Sistersville Plant (1987)

    Memo from W. V. Summers transmitting a brief on the Sistersville plant's strategy and resources for meeting newly required OSHA asbestos handling guidelines, with cost estimates for materials and personnel. Attached is a draft procedure for…

  12. Company document · Union Carbide documents · March 20, 1987

    C. A. Eddy to E. C. Buford and Others on March 19, 1987 Meeting Minutes, Methyls Columns Asbestos Insulation Removal at Sistersville (1987)

    Minutes, dated March 20, 1987, of a March 19, 1987 meeting at the Sistersville Plant to plan removal of asbestos insulation from six methyls columns. They list 19 items on the handling of each column, use of a negative pressure enclosure, area…

  13. Company document · Union Carbide documents · June 30, 1987

    T. L. Grittie Industrial Hygiene Reports on Insulator Asbestos Exposure Monitoring at Monomers and Polymers II (1987)

    Two industrial hygiene reports dated June 30, 1987 on airborne asbestos fiber sampling of insulators. The first covers patching insulation on a T-3 methyl chloride tank in Monomers (3/26/87 samples, all below the PEL); the second covers removing…

  14. Company document · Union Carbide documents · May 4, 1983

    Industrial Hygiene Results on Asbestos in Insulation Samples from Polymers I, by H. G. Kuntz and K. E. Williams (1983)

    One-page industrial hygiene report dated May 4, 1983, on samples of pipe insulation taken at Polymers I on 4-11-83 and 4-12-83 and examined by chemical microscopy. No asbestos was noted in insulation from K-41 piping, while insulation on a steam…

  15. Company document · Union Carbide documents · March 26, 1987

    Manhar A. Patel to J. W. Barna and Others on Asbestos Competent Person Training at the Technical Center (1987)

    Internal Union Carbide memo announcing a three-day asbestos competent person training course to be given by the National Asbestos Training Center (University of Kansas) at the Technical Center on April 8-10, 1987. It cites…

  16. Company document · Union Carbide documents · July 1, 1987

    T. L. Grittie Industrial Hygiene Results on Asbestos Monitoring of Insulators (Tank Farm 4) and the Poly I Control Room (1987)

    Two industrial hygiene result sheets dated July 1, 1987, reporting asbestos air sampling done in April 1987. Page 1 covers insulators using glove bags to strip T-111 in Tank Farm 4 in Silanes, and page 2 covers the Poly I control room, where…

  17. Company document · Union Carbide documents · July 1, 1987

    T. L. Grittie, Industrial Hygiene Results for Area Monitoring Near Exposed Asbestos on Silanes Rectification Tower (1987)

    One-page industrial hygiene report dated July 1, 1987, on an area air sample taken on 4/29/87 near exposed asbestos on a vertical line on the fourth deck of the Silanes Rectification tower. The single 386-minute sample was reported at

  18. Company document · Union Carbide documents · June 30, 1987

    Industrial Hygiene Monitoring Report on Area Asbestos Sampling N.E. of Tank Farm 3, Silanes, by C. R. McMillan and T. L. Grittie (1987)

    One-page industrial hygiene monitoring report dated June 30, 1987, on an area air sample collected 3/24/87 northeast of tank farm number 3 in Silanes, where white fibers were seen floating in the air. The sample result was below 0.005 f/cc, with a…

  19. Company document · Union Carbide documents · October 14, 1987

    JHM Laboratories Final Reports of Asbestos Air Sample Results for Union Carbide Sisterville (1987)

    Eleven pages of JHM Laboratories final reports to Union Carbide Sisterville (client no. 07-740149) listing asbestos-in-air results in fibers per cc, with sample IDs, sampling and receipt dates, and blank-sample remarks. Two…

  20. Company document · Union Carbide documents

    Kemron and JHM Laboratories Asbestos Air-Sample Analytical Reports for Union Carbide, Sistersville/Long Reach, WV (1986–1987)

    Kemron analytical report no. 3389 to Union Carbide, Long Reach WV (Attn: Ken Williams), report date 07/14/86; fibers per filter for samples Z-8062 to Z-8233 and a blank Kemron analytical report no…