8 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 3, 1986
F.D. Lutz to W.P. Fethke on Industrial Hygiene Survey of Room 77L, Linde Building, with A.J. Caglione's Email on the Insulation Removal (1986)
A March 3, 1986 internal memo reports air sampling for particulate on January 9, 1986 in Room 77L, Linde Building, Tarrytown, while General Services personnel removed piping insulation. The particulate was identified as amosite asbestos, and four…
-
Company document · Union Carbide documents · May 5, 1987
R. S. Newberger and J. K. Kyle Memos on Asbestos Disposal and Ceiling Contamination at the Sistersville, WV Plant (1987)
Two Union Carbide memoranda from the Sistersville, West Virginia plant. The first (May 5, 1987) reports that asbestos insulation was being stripped in the Silanes Department and that the burial location was full. The second (April…
-
Company document · Union Carbide documents · December 17, 1986
R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)
…13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…
-
Company document · Union Carbide documents · May 7, 1987
G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)
Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…
-
Company document · Union Carbide documents · May 27, 1987
G. W. Wulfert Minutes of the 'Future Asbestos Disposal Site(s)' Meeting, with Related Memos on the Sistersville Asbestos Landfill (1987)
Union Carbide Sistersville, WV plant memos from May 1987 about the plant's asbestos landfill, which held asbestos insulation removed from plant equipment. The May 27 minutes record an estimate that the present landfill had about…
-
Company document · Union Carbide documents · June 17, 1986
Internal Memo to W. P. Fethke on Removal of Asbestos Pipe Insulation from Lab 77L, Tarrytown (1986)
Internal Union Carbide memo dated 17 June 1986 about Allied shop personnel removing pipe insulation believed to be asbestos from Lab 77L at Tarrytown. The writer says the work was not done safely in two instances…
-
Company document · Union Carbide documents · June 17, 1986
A. J. Caglione to W. P. Fethke on Removal of Asbestos Pipe Insulation from Lab 77L (1986)
Internal memo reporting two occasions in 1986 (9 January in lab 77L, 14 April in lab 32L) when Allied shop personnel removed pipe insulation believed to be asbestos at the Tarrytown Technical Center. The writer gives his opinion that the work was…
-
Company document · Union Carbide documents · March 5, 1986
Tom Reynolds to A.J. Caglione on Asbestos Pipe Insulation Removal in Lab 77L, Tarrytown (1986)
Internal memo summarizing the status of suspected asbestos pipe insulation in Lab 77L of the Linde building at Tarrytown, from its identification in September 1984 through removal by Allied maintenance personnel in January 1986. It reports that a…