72 results for “Union Carbide Corporation”, page 1 of 4
-
Company document · Union Carbide documents · August 5, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)
Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…
-
Company document · Union Carbide documents · September 2, 1982
Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)
Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…
-
Company document · Union Carbide documents · November 24, 1980
Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)
One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…
-
Company document · Union Carbide documents · October 20, 1980
Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)
Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…
-
Company document · Union Carbide documents · October 5, 1978
C. W. Carman to E. R. Levy on Review Meeting of Personnel Safety and Health Training Packages (1978)
Memo dated October 5, 1978 from C. W. Carman to E. R. Levy, with copies to ten others, giving his comments on the personnel safety and health training elements discussed at a September 25, 1978 meeting. It lists suggestions from George Hurley, J. M.…
-
Company document · Union Carbide documents · September 9, 1980
Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)
A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · March 21, 1977
G. W. Bott to W. T. Shelton on Water Sprayers for Removing Asbestos Pipe Covering at the Tech Center (1977)
Internal Union Carbide correspondence from G. W. Bott to W. T. Shelton recommending the purchase of two one-gallon garden-type sprayers, similar to the Hudson Model 6215, for the Tech Center. The sprayers were to…
-
Company document · Union Carbide documents · October 2, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)
Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…
-
Company document · Union Carbide documents · December 17, 1986
R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)
…13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to D. R. Paugh and Others on Asbestos Air Monitoring at the South Charleston Plant (1977)
Internal Union Carbide memo reporting air sampling done on August 8, 1977 during removal of wet insulation, possibly containing asbestos, from a furnace at the South Charleston mainland powerhouse. It states that the results complied with…
-
Company document · Union Carbide documents · August 14, 1978
E. R. Levy Memo on Orientation for Personnel Safety and Health Training Package Preparers, with L. S. Slaughter Memo and Engineering Department Training Team Report (1978)
The exhibit holds two Union Carbide Engineering memoranda from August 1978 and attachments from a report of the Engineering Department's personnel safety and health training task team. E. R. Levy's memo of August 14…
-
Company document · Union Carbide documents · May 25, 1979
G. W. Bott to W. T. Shelton on Asbestos Exposure Survey of Insulators Stripping Old Insulation in Building 707 (1979)
Internal memo reporting an industrial hygiene survey, conducted May 9, 1979, of asbestos exposure of insulators stripping about ten feet of 1-inch steam condensate line insulation in Building 707 at South Charleston. It reports that the insulation…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Air Sampling During Insulation Removal at Institute Powerhouse (1977)
Internal memo reporting air samples taken August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample concentrations of 2.59 and 2.61 fibers/cc and an area sample…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the No. 1 Steam Plant Precipitators, Institute Plant (1980)
Internal memo reporting air sampling for asbestos on July 21, 1980 around asbestos-containing insulation on the No. 1 Steam Plant precipitators during the boiler retubing project at the Institute plant. It lists personal and area sample results,…
-
Company document · Union Carbide documents · April 1, 1987
Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)
Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…
-
Company document · Union Carbide documents · November 9, 1979
G. W. Bott to M. E. Perry on Asbestos Exposure from Sawing Transite Board on the DoAll Saw, Bldg. 704 Machine Shop (1979)
Internal industrial hygiene report on an October 30, 1979 survey of asbestos exposure while a machinist sawed transite (asbestos-containing) board on a DoAll saw in the Building 704 machine shop at South Charleston, West Virginia. It reports sample…