87 results for “Union Carbide Corporation”, page 1 of 5
-
Company document · Union Carbide documents · November 1972
OSHA Reply to D. E. Deese on Asbestos Monitoring and Medical Exams, with Union Carbide Asbestos Insulation Removal Procedures and F. Williams Memo to R. J. Taylor (1972)
Compilation of four items: an OSHA letter replying to a Union Carbide industrial hygienist about the asbestos monitoring and medical examination requirements of 29 CFR 1910.93a; a Seadrift Plant procedure for removing asbestos insulation; and…
-
Company document · Union Carbide documents · 1981
H. E. Fritz, Regulatory Report: Occupational Health & Safety Highlights, Union Carbide Health, Safety & Environmental Affairs Department (1981)
A Union Carbide regulatory report summarizing OSHA developments for September and October 1981. It covers OSHA's priority list (including asbestos), inspection targeting, ethylene oxide, access to medical records, a North Carolina byssinosis compensation decision, the…
-
Company document · Union Carbide documents · April 4, 1983
T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)
A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…
-
Company document · Union Carbide documents · December 20, 1983
Industrial Hygiene Monitoring for Asbestos: M. F. Stowers and M. A. Patel to W. T. Shelton, Personal Samples of Two Insulators in Bldg. 707 Cell 11 (1983)
Two industrial hygiene monitoring reports for asbestos, dated Dec. 20, 1983 (Computer Ref W-1508), covering personal samples taken 11/10/83 in Bldg. 707 Cell 11, first level. One sample for R. P. Hess measured 0.07 fibers/cc over 30 minutes, and one…
-
Company document · Union Carbide documents · April 20, 1983
Industrial Hygiene Monitoring for Asbestos: J. W. Greenlee Stripping Insulation from Hot Water Tank, to W. T. Shelton (1983)
Union Carbide industrial hygiene monitoring form reporting a 33-minute air sample taken April 6, 1983 on J. W. Greenlee in Building 709 while he stripped insulation from an old hot water tank. It records a…
-
Company document · Union Carbide documents · August 5, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…
-
Company document · Union Carbide documents · August 6, 1981
Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)
One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)
Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · September 2, 1982
Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)
Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…
-
Company document · Union Carbide documents · November 24, 1980
Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)
One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…
-
Company document · Union Carbide documents · October 20, 1980
Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)
Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…
-
Company document · Union Carbide documents · October 5, 1978
C. W. Carman to E. R. Levy on Review Meeting of Personnel Safety and Health Training Packages (1978)
Memo dated October 5, 1978 from C. W. Carman to E. R. Levy, with copies to ten others, giving his comments on the personnel safety and health training elements discussed at a September 25, 1978 meeting. It lists suggestions from George Hurley, J. M.…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)
Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…
-
Company document · Union Carbide documents · September 9, 1980
Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)
A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)
Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)
Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…
-
Company document · Union Carbide documents · March 21, 1977
G. W. Bott to W. T. Shelton on Water Sprayers for Removing Asbestos Pipe Covering at the Tech Center (1977)
Internal Union Carbide correspondence from G. W. Bott to W. T. Shelton recommending the purchase of two one-gallon garden-type sprayers, similar to the Hudson Model 6215, for the Tech Center. The sprayers were to…
-
Company document · Union Carbide documents · October 2, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)
Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…