17 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · 1987
Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)
…Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…
-
Company document · Union Carbide documents · May 1987
Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)
Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…
-
Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · September 28, 1987
H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal Union Carbide memo reporting the results of asbestos exposure monitoring on insulators who removed asbestos from steam and product lines in a pit and trench at building 25 near the #2 dock at the Institute…
-
Company document · Union Carbide documents · September 18, 1987
Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)
Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…
-
Company document · Union Carbide documents · July 23, 1987
Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)
Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…
-
Company document · Union Carbide documents · January 9, 1987
C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)
Internal correspondence in which C. R. Rotthoff commented on W. J. Vincent's South Charleston asbestos removal document, saying it assumed no technology exists to keep asbestos below the PEL. He suggested identifying which steps are mandatory…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
…with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…
-
Company document · Union Carbide documents · January 9, 1987
C. R. Rotthoff to W. J. Vincent Transmitting Comments on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)
Internal memo from C. R. Rotthoff to W. J. Vincent commenting on the South Charleston plant's draft asbestos removal document, suggesting that exposure be kept below the PEL where possible and that steps required because the PEL will be exceeded be…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · April 28, 1988
T. E. Hanning to D. A. Boggs and Others on Procedures for Handling Asbestos-containing Gaskets or Packing (1988)
Memo reporting that the Manufacturing Council accepted an Asbestos Phaseout Task Group recommendation to stop purchasing asbestos-containing materials after January 1, 1989, with GRAFOIL as the designated gasket and packing replacement. It discusses…
-
Company document · Union Carbide documents · March 20, 1987
C. A. Eddy to E. C. Buford and Others on March 19, 1987 Meeting Minutes, Methyls Columns Asbestos Insulation Removal at Sistersville (1987)
Minutes, dated March 20, 1987, of a March 19, 1987 meeting at the Sistersville Plant to plan removal of asbestos insulation from six methyls columns. They list 19 items on the handling of each column, use of a negative pressure enclosure, area…
-
Company document · Union Carbide documents · March 26, 1987
Manhar A. Patel to J. W. Barna and Others on Asbestos Competent Person Training at the Technical Center (1987)
Internal Union Carbide memo announcing a three-day asbestos competent person training course to be given by the National Asbestos Training Center (University of Kansas) at the Technical Center on April 8-10, 1987. It cites…