63 results for “Union Carbide Corporation”, page 1 of 4
-
Company document · Union Carbide documents · July 9, 1971
R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)
…July 9, 1971 cover memo sent a distribution list the minutes of a June 18, 1971 safety meeting among General Electric, Hooker Chemical and Union Carbide, and pointed readers to the asbestos paragraphs. The minutes, prepared…
-
Company document · Union Carbide documents · July 9, 1971
R. W. Schwartz to Bound Brook Distribution on GE/Hooker/Union Carbide Safety Meeting Minutes Covering Asbestos (1971)
…W. Schwartz dated July 9, 1971 transmitting the safety meeting minutes Minutes of June 18, 1971 GE/Hooker/Union Carbide safety meeting at Grand Island, NY, prepared by Dr. David Paff Final page with no legible…
-
Company document · Union Carbide documents · July 9, 1971
R. W. Schwartz to Bound Brook Distribution Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)
…R. W. Schwartz, July 9, 1971, transmitting the safety meeting minutes Minutes of the June 18, 1971 GE/Hooker/Union Carbide safety meeting at Hooker, Grand Island, N.Y., prepared by Dr. Paff (asbestos, TLV, respirators…
-
Company document · Union Carbide documents · February 29, 1972
Minutes of Meeting on Measuring Employee Asbestos Exposure to Meet the Proposed OSHA Standard, submitted by N. H. Ketcham (1972)
Minutes of a February 29, 1972 meeting of Union Carbide plant and Environmental Health Laboratory personnel to plan measurement of employee asbestos exposure under the proposed OSHA standard. The minutes list five objectives, attach an outline…
-
Company document · Union Carbide documents · August 5, 1980
Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)
Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…
-
Company document · Union Carbide documents · August 6, 1981
Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)
One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…
-
Company document · Union Carbide documents · February 29, 1972
N. H. Ketcham Minutes of Meeting on Measuring Employee Exposure to Asbestos Under the Proposed OSHA Standard (1972)
Minutes of a February 29, 1972 meeting of Union Carbide plant and laboratory staff to plan measurement of employee exposure to asbestos in line with the proposed OSHA standard. The minutes list objectives, agreed air-sampling…
-
Company document · Union Carbide documents · August 19, 1980
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)
Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · September 2, 1982
Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)
Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…
-
Company document · Union Carbide documents · November 24, 1980
Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)
One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…
-
Company document · Union Carbide documents · October 20, 1980
Industrial Hygiene Monitoring for Asbestos: Two Reports to W. T. Shelton on Stripping Insulation from the Dowtherm System, Bldg. 702 (1980)
Two industrial hygiene monitoring forms dated 10/20/80 reporting asbestos fiber samples taken outside Bldg. 702 while workers stripped and bagged insulation from a Dowtherm system. J. E. Hackney's sample was 3.04 fibers >5 µm/cm3 over 57 minutes,…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)
Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…
-
Company document · Union Carbide documents · September 9, 1980
Industrial Hygiene Monitoring for Asbestos Report to W. T. Shelton on Insulation Stripping in Building 705, Cell 8 (1980)
A one-page industrial hygiene monitoring form for asbestos covering Services Insulators stripping old insulation in Building 705, Cell 8, on 9/9/80. It records two air samples (1.17 and 1.30 fibers, 24 minutes at 2 LPM), lists the OSHA allowable…
-
Company document · Union Carbide documents · March 26, 1980
W. F. Blythe Jr. to W. T. Shelton on Asbestos Monitoring in Building 770 (1980)
Internal Union Carbide memo reporting a March 19, 1980 survey of insulators' exposure to asbestos while removing asbestos insulation tape from tubing in Room 237 of Building 770. It states all samples showed less than 0…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)
Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · December 5, 1978
G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)
A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)
Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…
-
Company document · Union Carbide documents · March 23, 1972
R. W. Cope Project Report on Industrial Hygiene Survey and Asbestos Air Analyses at the Bound Brook Plant (1972)
Project report (Project 910E10) on a February 14-15, 1972 visit to the Bound Brook Plant to sample air for asbestos fibers near Unit B, Building 3, and for nuisance dust at Unit 5, and to survey other production units for environmental health…