37 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents
Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · October 3, 1979
Ron Ritchie to J. B. Leverton and R. J. Taylor Forwarding OSHA Jobsite Information Survey Correspondence (1979)
Cover memo from Ron Ritchie passing along correspondence about OSHA Jobsite Information Surveys, with an Employee Relations memo from R. V. Welty (Oct. 1, 1979) and a Sept. 21, 1979 letter from Law Department attorney John W. Whittlesey to J. B.…
-
Company document · Union Carbide documents · November 29, 1983
Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)
A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · January 26, 1987
Kirk E. Martin to A. L. Welch on Asbestos Exposure Monitoring at Texas City, with Attached OSHA Appendix A and Related Correspondence (1987)
…1987 memo in which Kirk E. Martin responded to a contractor's complaint that Union Carbide's Texas City laboratory air-sample results for asbestos were inaccurate, stating the results stood and citing the OSHA counting…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · September 19, 1977
T. J. Covin to J. P. Alexander and Others on Compliance with the EPA Asbestos Regulation (1977)
Internal correspondence from T. J. Covin of the Taft EP Dept. to plant recipients about the EPA National Emission Standard for Asbestos (40 CFR 61), which requires EPA notification of removal of asbestos-containing insulation or fireproofing above…
-
Company document · Union Carbide documents · February 12, 1979
W. H. Barlow to J. B. Leverton on Asbestos Removal and Showers for Workers, with Attached Texas Air Control Board Delegation Memo and EPA Notice (1979)
A packet opening with a February 12, 1979 memo from W. H. Barlow to J. B. Leverton asking whether the Texas City plant's asbestos removal procedure needs revision, with particular concern that showers be provided for workers. Behind it are a January…
-
Company document · Union Carbide documents · August 13, 1985
S. J. Footer to F. S. Provenzano on the Texas City Plant Insulation Repair Program (1985)
Internal memo of August 13, 1985 recommending that the Texas City plant insulation repair project be split into operating facilities and facilities shut down for future demolition, with repair completion targets of one to three years depending on…
-
Company document · Union Carbide documents · October 31, 1979
Kirk E. Martin to J. H. Barrett et al. on OSHA Complaint Investigation at the Texas City Plant (1979)
Internal Union Carbide memo reporting an OSHA industrial hygienist's follow-up inspection on October 30, 1979 at the Texas City Plant, prompted by employee complaints of overexposure to ozone, argon and metal fumes while welding…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · September 13, 1984
W. J. Raglan to J. B. Leverton Transmitting Response to Operational Safety and Health Survey of the Acetone Unit, Plant 512, with Asbestos Exposure Item (1984)
A September 13, 1984 internal letter from W. J. Raglan to J. B. Leverton says responses to the OS/HS Team's March 1984 audit recommendations for the Acetone Unit were completed and cost estimates were being generated. It is followed by a cover page…
-
Company document · Union Carbide documents · February 1, 1982
M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)
Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…
-
Company document · Union Carbide documents · November 1, 1984
K. S. Teague to J. B. Leverton on an OSHA Inquiry About High Density Polyethylene (1984)
Internal memo reporting a November 1, 1984 telephone call from OSHA Compliance Officer Roy Piggee, who requested a Material Safety Data Sheet on UCC chemical #348, High Density Polyethylene. The writer said Piggee told him OSHA had received a…
-
Company document · Union Carbide documents · July 11, 1984
Kirk E. Martin to J. B. Leverton on Asbestos Demolition Inspection by Galveston County Health District and OSHA at Texas City (1984)
…present, of the Kimmins Corp. asbestos demolition job at Building 75 of the Texas City plant. It lists the inspector's three observations and says notices of violation would be sent to Union Carbide and Kimmins.