21 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · 1987
Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)
…Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…
-
Company document · Union Carbide documents · May 1987
Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)
Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…
-
Company document · Union Carbide documents · October 20, 1986
Memo to J. K. Corrie on Asbestos Disposal at Goff Mountain and a Parkersburg Landfill, South Charleston Plant (1986)
Memo dated October 20, 1986, from the Environmental Protection department at the South Charleston Plant to J. K. Corrie, with copies to several staff. It says Goff Mountain is close to banning asbestos disposal, names a Parkersburg landfill as the…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · September 25, 1986
W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)
A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · April 1, 1987
Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)
Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · July 8, 1987
W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)
Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…
-
Company document · Union Carbide documents · December 31, 1985
J. G. Roy Memoranda and Work Plan on Asbestos Removal at the No. 2 Steam Plant, South Charleston (1985)
Two memoranda from J. G. Roy, the first dated December 31, 1985, transmitting a plan to remove asbestos from idle facilities in the No. 2 Steam Plant and the second sending the work plan and a contractor sign-in form to the ES supervisors. The…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · February 18, 1987
W. J. Vincent to J. K. Corrie Transmitting Revised Asbestos Maintenance Procedure, South Charleston Plant (1987)
A one-page internal memo from W. J. Vincent to J. K. Corrie transmitting a revised Asbestos Maintenance Procedure for the South Charleston Plant, revised to comply with the new asbestos construction standard. The attached 18-page draft, 'Provisions…
-
Company document · Union Carbide documents · January 9, 1987
C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)
Internal correspondence in which C. R. Rotthoff commented on W. J. Vincent's South Charleston asbestos removal document, saying it assumed no technology exists to keep asbestos below the PEL. He suggested identifying which steps are mandatory…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
…with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…
-
Company document · Union Carbide documents · January 9, 1987
C. R. Rotthoff to W. J. Vincent Transmitting Comments on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)
Internal memo from C. R. Rotthoff to W. J. Vincent commenting on the South Charleston plant's draft asbestos removal document, suggesting that exposure be kept below the PEL where possible and that steps required because the PEL will be exceeded be…
-
Company document · Union Carbide documents · April 28, 1988
T. E. Hanning to D. A. Boggs and Others on Procedures for Handling Asbestos-containing Gaskets or Packing (1988)
Memo reporting that the Manufacturing Council accepted an Asbestos Phaseout Task Group recommendation to stop purchasing asbestos-containing materials after January 1, 1989, with GRAFOIL as the designated gasket and packing replacement. It discusses…
-
Company document · Union Carbide documents · May 14, 1986
M. E. Knopp Manhour Estimate for Stripping and Re-insulating Asbestos-Insulated Tanks, Bldg. 103-216, Phase I (1986)
Handwritten memo estimating Phase I manhours (1,924 total) to strip insulation, scaffold, remove scaffolds and re-insulate tanks in Bldg. 103-216, with a page-2 breakdown by tank, each labeled "ASBESTOS". A handwritten note dated 5/13/86 recommends…
-
Company document · Union Carbide documents · March 26, 1987
Manhar A. Patel to J. W. Barna and Others on Asbestos Competent Person Training at the Technical Center (1987)
Internal Union Carbide memo announcing a three-day asbestos competent person training course to be given by the National Asbestos Training Center (University of Kansas) at the Technical Center on April 8-10, 1987. It cites…
-
Company document · Union Carbide documents · January 23, 1986
M. E. Knopp to Dao Nguyen on Asbestos Insulation Found at the Filmont Dump (1986)
Internal correspondence from the A-1 Insulation Supervisor at the South Charleston Plant, West Virginia, reporting an on-site inspection of the Filmont Dump for asbestos insulation discovered by the State E.P.A. Department. It says four bags of…