  1. Company document · Union Carbide documents · June 20, 1983

    H. G. Kuntz and K. E. Williams, Industrial Hygiene Results on Insulator Exposure During Asbestos Insulation Removal, with Spectroscopy Lab Sheet and Data Table (1983)

    Page 1 is an industrial hygiene report dated June 20, 1983 on airborne asbestos measured while insulators removed asbestos-containing insulation in several plant areas, with results compared to the permissible ceiling and 8-hour TWA. Page 2 is a…

  2. Company document · Union Carbide documents · March 25, 1983

    Industrial Hygiene Results: Identification of Insulation Samples from the Steam Plant, by H. G. Kuntz and K. E. Williams (1983)

    Industrial hygiene report dated March 25, 1983, giving results of chemical microscopy on insulation samples collected March 9 and 17, 1983 at the Steam Plant. The T-49 condensate tank sample appeared to contain some asbestos; the other two samples…

  3. Company document · Union Carbide documents · April 8, 1983

    K. E. Williams Industrial Hygiene Results on Airborne Asbestos Near #3 Boiler, with IHI-Kemron Fiber Count Analyses (1983)

    Union Carbide Industrial Hygiene Results, April 8, 1983: asbestos fiber concentrations at #3 boiler, signed K. E. Williams, with handwritten annotations IHI-Kemron report KM-25-0017-83, March 28, 1983, to K. E. Williams: asbestos…

  4. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  5. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…

  6. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…

  7. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  8. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  9. Company document · Union Carbide documents · March 25, 1983

    Industrial Hygiene Results: Insulation Sampling on Water Tank T-1098, Esters Area, by H. G. Kuntz and K. E. Williams (1983)

    One-page industrial hygiene report dated March 25, 1983, on samples of loose and rigid insulation taken on March 23, 1983 from water tank T-1098 near the Esters tower. Chemical microscopy found no asbestos in either sample, and the report…

  10. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…

  11. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  12. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  13. Company document · Union Carbide documents · September 18, 1987

    Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)

    Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…

  14. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…

  15. Company document · Union Carbide documents · June 3, 1983

    Industrial Hygiene Results: Asbestos Fiber Counts near Roped-Off Area West of #1 Boiler, Energy Systems, by H. G. Kuntz and K. E. Williams (1983)

    Industrial hygiene report dated June 3, 1983, giving results of area air samples taken on 3-15-83 and 3-17-83 near a roped-off area west of #1 boiler where insulation was to be removed (Energy Systems). Three samples measured 0.02 to 0.09 asbestos…

  16. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…

  17. Company document · Union Carbide documents · June 19, 1986

    V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)

    Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…

  18. Company document · Union Carbide documents · April 29, 1987

    V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)

    Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…

  19. Company document · Union Carbide documents · February 1, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring of Construction Employees at the Sistersville Plant (1984)

    Memo reporting personal exposure monitoring for asbestos on January 12, 1984, while Construction Department employees stripped asbestos-containing pipe insulation at the Sistersville Plant steam plant. It states all monitored results were below the…

  20. Company document · Union Carbide documents · June 2, 1983

    Industrial Hygiene Results: Asbestos Exposure Monitoring in the Process & Unit Control Laboratory, K. E. Williams (1983)

    One-page industrial hygiene report dated June 2, 1983, on asbestos air sampling of employees of the Process & Unit Control Laboratory on March 10, 15 and 16, 1983. It reported 1.82 fibers/cc during a two-minute pressure filter preparation and 0.03…