No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

11 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · January 28, 1980

    Handwritten Memo to A. S. Howard, C. E. Richards and R. S. Howell About a Mailing List Used for Plant Work (1980)

    A one-page handwritten note on a preprinted Union Carbide memo form, dated January 28, 1980 and addressed to three recipients. It says that a Mr. Eatt (name uncertain) had already used a mailing list for…

  2. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  3. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…

  4. Company document · Union Carbide documents · December 17, 1980

    G. F. Hurley to K. O. Hopkins on Construction Employees Dust Exposure Monitoring at the Alloy Furnace Job, with Sample Data Tables and a BNA Occupational Safety & Health Reporter Issue (1980)

    …Hopkins, with a distribution list, on dust sampling of construction craftspeople rebuilding furnaces 3 and 7 at the Union Carbide Alloy Plant. It reports that none of 34 samples exceeded the OSHA nuisance-dust limits, but…

  5. Company document · Union Carbide documents · November 16, 1979

    Ruth Clise to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)

    Internal industrial hygiene report on a survey of October 26, 1979, measuring construction workers' exposure to asbestos fibers while insulation was stripped from an exhaust duct in the Building 704 Powerhouse. It reports that the dust was too heavy…

  6. Company document · Union Carbide documents · June 2, 1977

    J. P. Gregory to J. W. Biddle and Others on Asbestos Insulation Stripping and Air Sampling at the Institute Plant (1977)

    Internal memo reporting air sampling done on May 26, 1977 while asbestos insulation was stripped from the dust collector on #2 boiler at the Institute Plant. It lists area and personal sample results, including 2.44 and 1.78 fibers/cc for personal…

  7. Company document · Union Carbide documents · June 2, 1977

    J. P. Gregory to J. W. Biddle and Others on Asbestos Insulation Stripping and Air Sampling at the Institute Plant (1977)

    Internal memo reporting air sampling during the stripping of asbestos insulation from the dust collector on #2 boiler at the Institute Plant on 5/26/77. It lists area and personal sample results and concludes that one sample slightly exceeded the…

  8. Company document · Union Carbide documents · October 5, 1979

    W. B. Troutman to Mailing List A-8 on Asbestos Handling at the South Charleston Plant, with Attached Handling Procedure (1979)

    Internal correspondence from the South Charleston Plant Safety Director transmitting a procedure for handling asbestos-containing insulation. The memo states that asbestos has been recognized as a serious health hazard and that the attached…

  9. Company document · Union Carbide documents · April 16, 1980

    Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)

    Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…

  10. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)

    Internal report on air sampling for asbestos fibers on October 26, 1979, while construction workers stripped and bagged insulation from an exhaust duct in Building 704 Powerhouse. It states that dust on the workers' breathing zone samples was too…

  11. Company document · Union Carbide documents · October 5, 1979

    William B. Troutman to Mailing List A-8 on Asbestos Handling Procedure at the South Charleston Plant (1979)

    Internal correspondence from the South Charleston Plant Safety Director transmitting a Maintenance Department procedure for handling asbestos-containing insulation. The attachment describes health considerations, OSHA limits, and mandatory…