Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · November 22, 1985
G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)
Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · December 12, 1984
M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)
Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · May 16, 1985
M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)
Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · September 28, 1987
H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal Union Carbide memo reporting the results of asbestos exposure monitoring on insulators who removed asbestos from steam and product lines in a pit and trench at building 25 near the #2 dock at the Institute…
-
Company document · Union Carbide documents · September 18, 1987
Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)
Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…
-
Company document · Union Carbide documents · November 13, 1987
M. A. Patel to P. L. Graham et al. on Respiratory Protection for Asbestos, with 1984 R. G. Hanlon Memo and DuPont Respirator Study Figures (1987)
A November 13, 1987 internal memo from Manhar A. Patel forwarded a DuPont study of respirator performance against asbestos fibers and continued to recommend 3M respirators. Attached were a November 6, 1984 Richard G. Hanlon memo on the same subject,…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…
-
Company document · Union Carbide documents · July 23, 1987
Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)
Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…
-
Company document · Union Carbide documents · November 22, 1983
Manhar A. Patel to D. R. Paugh Transmitting the 1984 Industrial Hygiene Program for the 511 Construction Department (1983)
Internal Union Carbide correspondence from Manhar A. Patel transmitting a 1984 industrial hygiene program for the 511 Construction Department. The attached program lists planned exposure monitoring by shop and frequency, including dust in the insulation shop…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · January 14, 1985
W. L. Browning to R. L. Noble on Asbestos Handled by Toolroom Personnel and Toolroom Waste (1985)
One-page memorandum from W. L. Browning to R. L. Noble, copied to M. L. Mills and R. C. Proffitt, about asbestos handled by toolroom personnel. It states that gaskets are cut from asbestos-containing material in the Gasket Shop and that scrap must…
-
Company document · Union Carbide documents · January 19, 1984
M. A. Patel to M. L. Mills on Identification of an Unknown Material at the Institute Plant, with L. D'Esposito's IR Spectrum Memo (1984)
Internal Union Carbide correspondence from January 1984 about a white powdery material found oozing from the floor of the field toilet in the construction shop area at the Institute plant. An R/D memo reported an…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · February 1, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring of Construction Employees at the Sistersville Plant (1984)
Memo reporting personal exposure monitoring for asbestos on January 12, 1984, while Construction Department employees stripped asbestos-containing pipe insulation at the Sistersville Plant steam plant. It states all monitored results were below the…