No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

29 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · September 12, 1986

    C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)

    A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…

  2. Company document · Union Carbide documents · June 20, 1983

    H. G. Kuntz and K. E. Williams, Industrial Hygiene Results on Insulator Exposure During Asbestos Insulation Removal, with Spectroscopy Lab Sheet and Data Table (1983)

    Page 1 is an industrial hygiene report dated June 20, 1983 on airborne asbestos measured while insulators removed asbestos-containing insulation in several plant areas, with results compared to the permissible ceiling and 8-hour TWA. Page 2 is a…

  3. Company document · Union Carbide documents · March 25, 1983

    Industrial Hygiene Results: Identification of Insulation Samples from the Steam Plant, by H. G. Kuntz and K. E. Williams (1983)

    Industrial hygiene report dated March 25, 1983, giving results of chemical microscopy on insulation samples collected March 9 and 17, 1983 at the Steam Plant. The T-49 condensate tank sample appeared to contain some asbestos; the other two samples…

  4. Company document · Union Carbide documents · April 8, 1983

    K. E. Williams Industrial Hygiene Results on Airborne Asbestos Near #3 Boiler, with IHI-Kemron Fiber Count Analyses (1983)

    Union Carbide Industrial Hygiene Results, April 8, 1983: asbestos fiber concentrations at #3 boiler, signed K. E. Williams, with handwritten annotations IHI-Kemron report KM-25-0017-83, March 28, 1983, to K. E. Williams: asbestos…

  5. Company document · Union Carbide documents · November 22, 1985

    G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…

  6. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…

  7. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  8. Company document · Union Carbide documents · March 25, 1983

    Industrial Hygiene Results: Insulation Sampling on Water Tank T-1098, Esters Area, by H. G. Kuntz and K. E. Williams (1983)

    One-page industrial hygiene report dated March 25, 1983, on samples of loose and rigid insulation taken on March 23, 1983 from water tank T-1098 near the Esters tower. Chemical microscopy found no asbestos in either sample, and the report…

  9. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…

  10. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…

  11. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  12. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…

  13. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)

    Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…

  14. Company document · Union Carbide documents · October 20, 1981

    M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)

    Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…

  15. Company document · Union Carbide documents · June 3, 1983

    Industrial Hygiene Results: Asbestos Fiber Counts near Roped-Off Area West of #1 Boiler, Energy Systems, by H. G. Kuntz and K. E. Williams (1983)

    Industrial hygiene report dated June 3, 1983, giving results of area air samples taken on 3-15-83 and 3-17-83 near a roped-off area west of #1 boiler where insulation was to be removed (Energy Systems). Three samples measured 0.02 to 0.09 asbestos…

  16. Company document · Union Carbide documents · April 26, 1982

    Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)

    Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…

  17. Company document · Union Carbide documents · November 13, 1987

    M. A. Patel to P. L. Graham et al. on Respiratory Protection for Asbestos, with 1984 R. G. Hanlon Memo and DuPont Respirator Study Figures (1987)

    A November 13, 1987 internal memo from Manhar A. Patel forwarded a DuPont study of respirator performance against asbestos fibers and continued to recommend 3M respirators. Attached were a November 6, 1984 Richard G. Hanlon memo on the same subject,…

  18. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…

  19. Company document · Union Carbide documents · November 22, 1983

    Manhar A. Patel to D. R. Paugh Transmitting the 1984 Industrial Hygiene Program for the 511 Construction Department (1983)

    Internal Union Carbide correspondence from Manhar A. Patel transmitting a 1984 industrial hygiene program for the 511 Construction Department. The attached program lists planned exposure monitoring by shop and frequency, including dust in the insulation shop…

  20. Company document · Union Carbide documents · October 23, 1981

    M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)

    Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…