Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · March 21, 1984
G. D. Twait to Wayne Williams on November 1983 Revisions to SH-256, Removal and Handling of Asbestos-Containing Insulation Material (1984)
A handwritten 1984 note from G. D. Twait to Wayne Williams confirming that the asbestos permissible exposure limit in the November 1983 revision of SH-256 would stay at 0.5 fibers/cc, with attached material. The attachments are the OSHA emergency…
-
Company document · Union Carbide documents · November 29, 1983
Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)
A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · September 2, 1987
L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)
Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · October 28, 1986
T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)
Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · February 1, 1984
C. A. McNeill to J. B. Mickey Transmitting Draft Safety and Health Requirements for Contractors, Sistersville Plant (1984)
A February 1, 1984 cover memo from C. A. McNeill to J. B. Mickey attaching a draft package of three documents on safety and health requirements for contractors at the Sistersville Plant. The package includes contractor rules, a list of potential…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · February 1, 1982
M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)
Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…
-
Company document · Union Carbide documents · October 29, 1986
W. V. Summers to D. Liebeskind on the Sistersville Asbestos Insulation Upgrade Project (1986)
Memo dated October 29, 1986 from W. V. Summers at the Sistersville, WV plant to D. Liebeskind, with copies to six others, giving comments on the plant's asbestos insulation upgrade project. It describes damaged installed asbestos insulation as the…