  1. Company document · Union Carbide documents

    Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)

    Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…

  2. Company document · Union Carbide documents · 1986

    West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)

    …Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…

  3. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  4. Company document · Union Carbide documents · September 12, 1986

    C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)

    A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…

  5. Company document · Union Carbide documents · April 1, 1987

    R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)

    One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…

  6. Company document · Union Carbide documents · November 29, 1983

    Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)

    A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…

  7. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  8. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…

  9. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…

  10. Company document · Union Carbide documents · March 19, 1982

    Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)

    Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…

  11. Company document · Union Carbide documents · November 22, 1985

    G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…

  12. Company document · Union Carbide documents · December 12, 1984

    M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)

    Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…

  13. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)

    Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…

  14. Company document · Union Carbide documents · April 23, 1986

    Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)

    Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…

  15. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  16. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…

  17. Company document · Union Carbide documents · June 4, 1979

    W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal in Building 5 at Institute (1979)

    Internal Union Carbide Chemicals and Plastics memo reporting an April 30, 1979 survey of employee asbestos exposure during removal of piping insulation in Building 5 at Institute, West Virginia. One personal sample was voided and the…

  18. Company document · Union Carbide documents · August 25, 1977

    W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Air Sampling During Insulation Removal at Institute Powerhouse (1977)

    Internal memo reporting air samples taken August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample concentrations of 2.59 and 2.61 fibers/cc and an area sample…

  19. Company document · Union Carbide documents · May 16, 1985

    M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)

    Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…

  20. Company document · Union Carbide documents · January 6, 1984

    L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)

    Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…