No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

53 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · November 1972

    OSHA Reply to D. E. Deese on Asbestos Monitoring and Medical Exams, with Union Carbide Asbestos Insulation Removal Procedures and F. Williams Memo to R. J. Taylor (1972)

    Compilation of four items: an OSHA letter replying to a Union Carbide industrial hygienist about the asbestos monitoring and medical examination requirements of 29 CFR 1910.93a; a Seadrift Plant procedure for removing asbestos insulation; and…

  2. Company document · Union Carbide documents · 1981

    H. E. Fritz, Regulatory Report: Occupational Health & Safety Highlights, Union Carbide Health, Safety & Environmental Affairs Department (1981)

    A Union Carbide regulatory report summarizing OSHA developments for September and October 1981. It covers OSHA's priority list (including asbestos), inspection targeting, ethylene oxide, access to medical records, a North Carolina byssinosis compensation decision, the…

  3. Company document · Union Carbide documents · July 9, 1971

    R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)

    …July 9, 1971 cover memo sent a distribution list the minutes of a June 18, 1971 safety meeting among General Electric, Hooker Chemical and Union Carbide, and pointed readers to the asbestos paragraphs. The minutes, prepared…

  4. Company document · Union Carbide documents · March 31, 1969

    R. E. Joyner to C. U. Dernehl and N. H. Ketcham Forwarding Johns-Manville Safety Precautions for Asbestos Fibres (1969)

    Cover letter from R. E. Joyner, M.D. to Dr. Dernehl and Mr. Ketcham forwarding attached letters on asbestos fibre safety precautions and noting he advised Texas City people to contact the company rather than the government. The attachment is a March…

  5. Company document · Union Carbide documents · May 17, 1968

    Fred Williams to Dr. T. G. Day and Others on Preliminary Air Sampling Results for Asbestos (1968)

    Memorandum from the industrial hygienist reporting preliminary air sampling for asbestos taken during pipe-insulation work at the Technical Center on April 24, 1968. It summarizes the TLV, disease background, sampling method and results, and…

  6. Company document · Union Carbide documents · April 4, 1983

    T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)

    A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…

  7. Company document · Union Carbide documents · December 20, 1983

    Industrial Hygiene Monitoring for Asbestos: M. F. Stowers and M. A. Patel to W. T. Shelton, Personal Samples of Two Insulators in Bldg. 707 Cell 11 (1983)

    Two industrial hygiene monitoring reports for asbestos, dated Dec. 20, 1983 (Computer Ref W-1508), covering personal samples taken 11/10/83 in Bldg. 707 Cell 11, first level. One sample for R. P. Hess measured 0.07 fibers/cc over 30 minutes, and one…

  8. Company document · Union Carbide documents · April 20, 1983

    Industrial Hygiene Monitoring for Asbestos: J. W. Greenlee Stripping Insulation from Hot Water Tank, to W. T. Shelton (1983)

    Union Carbide industrial hygiene monitoring form reporting a 33-minute air sample taken April 6, 1983 on J. W. Greenlee in Building 709 while he stripped insulation from an old hot water tank. It records a…

  9. Company document · Union Carbide documents · August 6, 1981

    Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)

    One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…

  10. Company document · Union Carbide documents · March 19, 1982

    Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)

    Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…

  11. Company document · Union Carbide documents · March 31, 1969

    R. E. Joyner to C. U. Dernehl Transmitting Consumer Products Division Memo on Asbestos Fibre Safety Precautions (1969)

    …N. H. Ketcham, 31 March 1969, forwarding attached letters Union Carbide Consumer Products Division (Quality & Specifications, Cleveland) memo of March 18, 1969 to plant managers quoting Johns-Manville letter on asbestos fibre safety precautions, signed P…

  12. Company document · Union Carbide documents · September 2, 1982

    Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)

    Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…

  13. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…

  14. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)

    Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…

  15. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)

    Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…

  16. Company document · Union Carbide documents · June 20, 1984

    M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)

    Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…

  17. Company document · Union Carbide documents · August 24, 1965

    J. D. Young to K. B. Lanham on Dust Sampling of "Carey-Temp" Insulation Block Cutting (1965)

    Internal correspondence from Industrial Hygiene reporting on a dust sampling series run in the Insulation Fabrication Shop while a head grinder machine cut "Carey-Temp" insulation block. It said the dust-exposure health hazard of the operation was…

  18. Company document · Union Carbide documents · August 24, 1955

    J. D. Young to K. B. Lanham on Dust Sampling of "Carey-Temp" Insulation Block Cutting (1955)

    Internal Chemicals Division memo from Industrial Hygiene at the Institute Plant to the Insulation Fabrication Shop. It reported results of dust sampling done while a head grinder machine cut "Carey-Temp" insulation block. It said the health hazard…

  19. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  20. Company document · Union Carbide documents · July 16, 1982

    Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)

    Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…