33 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · 1981

    Breathing Air Inspection and Audit and Sanitation Inspection Forms for Reaction #2 (1981)

    Four pages of completed plant inspection forms for the Reaction #2 area: a two-page Breathing Air Inspection and Audit checklist and a two-page Sanitation Inspection checklist. On the breathing air form every item is checked "Yes" and the comments…

  2. Company document · Union Carbide documents · January 13, 1978

    R. E. Graebert Forwarding J. W. Whittlesey's Advice to Dr. Welsh on OSHA Recordkeeping of Occupational Illnesses (1978)

    A one-page cover memo dated January 13, 1978 from R. E. Graebert (Chemicals and Plastics Safety) to safety directors and the safety committee, attaching John W. Whittlesey's January 9, 1978 letter to Dr. Welsh on OSHA recordkeeping. The letter said…

  3. Company document · Union Carbide documents · April 23, 1978

    K. Gran Townsend to B. F. Brown, R. C. Glock, E. O. Davis and R. F. Green Transmitting Status of OSHA Health Standards for Chemical Exposure (1978)

    A cover memo from K. Gran Townsend of Union Carbide's Chemicals and Plastics unit transmitted an updated summary of OSHA standards activity as of April 1978. The attachment lists completed and proposed OSHA health standards…

  4. Company document · Union Carbide documents · August 22, 1979

    K. Gran Townsend to Plant Distribution on OSHA Inspection of Brown & Root at Brownsville, with Mario Gutierrez's Inspection Summary (1979)

    Cover memo of August 22, 1979 forwarding a summary of an OSHA inspection of contractor Brown & Root at the Brownsville plant, reporting that no citations were given. The attached August 16, 1979 summary to K. G. Townsend describes the August 15…

  5. Company document · Union Carbide documents · 1981

    Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (1981)

    A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated fourth quarter 1981, with a ventilation inspection and audit checklist for a lab hood in Building 522 Recovery. The audit form marked no deficiency and…

  6. Company document · Union Carbide documents · September 27, 1978

    L. T. Windel to K. G. Townsend Forwarding the Revised EPA Asbestos Air Pollutant Regulation, 40 CFR 61, Brownsville Plant (1978)

    A two-page internal memo from L. T. Windel to K. G. Townsend at the Brownsville, Texas plant forwarding the revised asbestos air pollutant regulation. It notes the EPA notification requirement for removal of asbestos pipe covering and proposes a…

  7. Company document · Union Carbide documents · April 5, 1984

    W. C. Young to T. G. Swanson on Court Ruling Disallowing the OSHA Asbestos Emergency Temporary Standard (1984)

    A one-page memorandum from W. C. Young to T. G. Swanson, with copies to others, reproducing a summary from Occupational Safety and Health Reporter. The summary reports that the Fifth Circuit struck down OSHA's emergency asbestos standard. Young…

  8. Company document · Union Carbide documents · August 22, 1979

    K. G. Townsend to A. L. Barefoot and Others Transmitting Summary of OSHA Inspection of Brown & Root at the Brownsville Plant (1979)

    A cover memo of August 22, 1979 transmits a summary of an OSHA inspection of Union Carbide's contractor Brown & Root at the Brownsville plant. The attached memo of August 16, 1979, addressed to K. G…

  9. Company document · Union Carbide documents · March 30, 1977

    J. L. Garcia to B. F. Brown, R. C. Glock, K. G. Townsend and Staff on the EPA Asbestos Standard and Proposed Amendment (1977)

    Internal Union Carbide correspondence from the Brownsville, Texas, Chemicals and Plastics location summarizing the EPA national emission standard for asbestos, first promulgated April 6, 1973. It describes the demolition and renovation notification and removal requirements, the…

  10. Company document · Union Carbide documents · 1981

    Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (4Q 1981)

    A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated 4Q 1981, followed by a Ventilation Inspection and Audit checklist for a lab hood in Building 522 Recovery. The form records no deficiency, says the procedure is…

  11. Company document · Union Carbide documents · August 20, 1975

    C. A. Keil to Energy Area Staff on Pre-Startup Safety Review of #2 Steam Turbine Generator Lube Oil System, Brownsville (1975)

    Internal correspondence from the Brownsville, Texas Chemicals and Plastics site, dated August 20, 1975, naming a team to conduct a pre-startup safety review of the new #2 steam turbine generator oil reservoir installation. It sets the review for…

  12. Company document · Union Carbide documents · June 26, 1981

    D. T. Watters to I. P. Blackwood et al. on Potential Health Risks of Insulation Materials (Perlite Insulation Specification 4) (1981)

    Memorandum from D. T. Watters, June 26, 1981, on potential health risks of insulation materials Union Carbide Chemicals/Plastics Material Specification for Insulation 4M/4A/4SS (perlite), December 1980, pages 1-2 of 2

  13. Company document · Union Carbide documents · October 5, 1979

    W. B. Troutman to Mailing List A-8 on Asbestos Handling at the South Charleston Plant, with Attached Handling Procedure (1979)

    Internal correspondence from the South Charleston Plant Safety Director transmitting a procedure for handling asbestos-containing insulation. The memo states that asbestos has been recognized as a serious health hazard and that the attached…

  14. Company document · Union Carbide documents · July 14, 1983

    Bill Young to Maintenance Area Superintendents Forwarding OSHA Plans Asbestos Exposure Limit Reduction Report (1983)

    A one-page Union Carbide South Charleston Plant internal memo transmitting an attached Occupational Safety & Health Reporter article on OSHA's plans to lower the asbestos exposure limit. The attached BNA report (July 7, 1983) states…

  15. Company document · Union Carbide documents · August 22, 1979

    K. G. Townsend to Distribution on OSHA Inspection of Contractor Brown & Root at Brownsville Plant, with Attached Inspection Summary (1979)

    A cover memo of August 22, 1979 forwards a summary of an OSHA inspection of Union Carbide's contractor Brown & Root at the Brownsville, Texas plant and says no citations were given. The attached August 16…

  16. Company document · Union Carbide documents · October 9, 1979

    Harvey R. Schulz to J. H. Barrett et al. on OSHA Complaint Investigation at the Texas City Plant (1979)

    Internal memo reporting an OSHA industrial hygienist's September 28, 1979 visit to the Texas City Plant to investigate an employee complaint about road dust north of the #3 Olefins furnaces. It describes the meeting and tour, the plant's…

  17. Company document · Union Carbide documents · April 6, 1977

    Jose L. Garcia to B. F. Brown, R. C. Glock, K. G. Townsend and Staff on the EPA Asbestos Standard and Proposed Amendment (1977)

    Internal correspondence from Brownsville, Texas summarizing the part of the EPA asbestos standard that applies to demolition and renovation of buildings and structures. It states the pipe and surface-area amounts of asbestos material above which the…

  18. Company document · Union Carbide documents · September 9, 1976

    K. Gran Townsend to G. P. Durocher on Handling Asbestos Materials in the Brownsville Plant Warehouse (1976)

    Internal letter-memo dated September 9, 1976, following a visit to the Brownsville Plant warehouse at G. P. Durocher's request for guidance on handling asbestos-containing materials. It states the small quantity on hand should not be a health hazard…

  19. Company document · Union Carbide documents · 1981

    Share Audit Procedure and Hearing Protection, Noise and Ventilation Inspection Forms, Maintenance Department (4Q 1981)

    Set of mostly handwritten-fill audit forms for the Maintenance Department, fourth quarter 1981, covering the ventilation, noise and hearing protection procedure. The summary form records 10 personnel interviewed, no deficiency, and a re-audit set…

  20. Company document · Union Carbide documents · October 5, 1979

    William B. Troutman to Mailing List A-8 on Asbestos Handling Procedure at the South Charleston Plant (1979)

    Internal correspondence from the South Charleston Plant Safety Director transmitting a Maintenance Department procedure for handling asbestos-containing insulation. The attachment describes health considerations, OSHA limits, and mandatory…