No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

66 results for “Union Carbide Corporation”, page 1 of 4

  1. Company document · Union Carbide documents · 1980

    Union Carbide Industrial Hygiene Monitoring for Asbestos Forms, Bldg. 777 Insulation Stripping, Including Reports to R. F. Painter (1980)

    Seven "Industrial Hygiene Monitoring for Asbestos" forms dated February to September 1980, mostly for work in Bldg. 777. They record fiber concentrations, sampling times, time-weighted averages, the OSHA allowable exposure, and comments on wetting…

  2. Company document · Union Carbide documents · September 5, 1986

    T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)

    …marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…

  3. Company document · Union Carbide documents · August 25, 1980

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging at Bldg. 777, Addressed to R. F. Painter (1980)

    Three Industrial Hygiene Monitoring for Asbestos forms (Computer Ref. W-1078) reporting air samples taken 8/25/80 at Bldg. 777, between the eastern side of the ACR unit and the dewatering shed, during insulation stripping and bagging. Each form…

  4. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777, to R. F. Painter (1980)

    Five 'Industrial Hygiene Monitoring for Asbestos' report forms covering workers wetting, bagging and stripping insulation in Bldg. 777. On 8/18/80 and 8/19/80, R. E. Templeton's samples gave time-weighted averages of 2.8 and 2.5 fibers >5 µm/cm3,…

  5. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)

    Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…

  6. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging Samples, Bldg. 774, Report to R. F. Painter (1981)

    Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, reporting airborne asbestos fiber results for four workers sampled on 07/10/81 while stripping and bagging insulation from a steam…

  7. Company document · Union Carbide documents · May 3, 1985

    M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)

    Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…

  8. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated 04/22/81, reporting air sampling on 04/20/81 of two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773…

  9. Company document · Union Carbide documents · November 29, 1983

    Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)

    A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…

  10. Company document · Union Carbide documents

    Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)

    A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…

  11. Company document · Union Carbide documents · March 19, 1982

    Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)

    Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…

  12. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms for asbestos dated 7/3/80, reporting air samples taken on workers stripping and bagging cooling tower insulation in the basement of Building 789. Morning sample results were .3, .7 and .3 fibers >5 µm/cm3;…

  13. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)

    Two industrial hygiene monitoring forms dated 04/22/81 reporting airborne asbestos fiber sampling on 04/20/81 for two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773. The first form reports D. C. Shamblin's results…

  14. Company document · Union Carbide documents · November 22, 1985

    G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…

  15. Company document · Union Carbide documents · July 23, 1986

    Industrial Hygiene (V. E. Stover and M. A. Patel) to O. R. Hay and Others on Asbestos Exposure Monitoring of R. E. Smith in the 701 Basement (1986)

    Internal Union Carbide memo transmitting the results of personal asbestos air monitoring of employee R. E. Smith, who was shredding paper in the 701 basement on July 1, 1986. The monitoring was requested because of concern…

  16. Company document · Union Carbide documents · April 26, 1982

    Mark E. Bell to R. F. Painter on Industrial Hygiene Asbestos Monitoring of R. E. Templeton, Building 706 (1982)

    A one-page Union Carbide industrial hygiene monitoring form reporting a personal air sample taken on R. E. Templeton on 04/21/82 in Building 706 during insulation stripping. It lists a result of 0.9…

  17. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms for asbestos, each dated 7/3/80, reporting air samples taken in the basement of Bldg. 789 (cooling tower) while insulation was stripped and bagged. A.M. sample results were .3 (C. Miller), .7 (D. C.…

  18. Company document · Union Carbide documents · July 24, 1986

    V. E. Stover and M. A. Patel to A. F. Terry on Asbestos Exposure Monitoring in Building 770 (1986)

    Internal Union Carbide memo reporting asbestos air monitoring on June 23, 1986 in Building 770 while two employees removed about 15 feet of asbestos insulation from a steam line in an air handler. It states the…

  19. Company document · Union Carbide documents · September 15, 1987

    H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)

    Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…

  20. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…