7 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 25, 1983
Industrial Hygiene Results: Identification of Insulation Samples from the Steam Plant, by H. G. Kuntz and K. E. Williams (1983)
Industrial hygiene report dated March 25, 1983, giving results of chemical microscopy on insulation samples collected March 9 and 17, 1983 at the Steam Plant. The T-49 condensate tank sample appeared to contain some asbestos; the other two samples…
-
Company document · Union Carbide documents · April 8, 1983
K. E. Williams Industrial Hygiene Results on Airborne Asbestos Near #3 Boiler, with IHI-Kemron Fiber Count Analyses (1983)
Union Carbide Industrial Hygiene Results, April 8, 1983: asbestos fiber concentrations at #3 boiler, signed K. E. Williams, with handwritten annotations IHI-Kemron report KM-25-0017-83, March 28, 1983, to K. E. Williams: asbestos…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · June 3, 1983
Industrial Hygiene Results: Asbestos Fiber Counts near Roped-Off Area West of #1 Boiler, Energy Systems, by H. G. Kuntz and K. E. Williams (1983)
Industrial hygiene report dated June 3, 1983, giving results of area air samples taken on 3-15-83 and 3-17-83 near a roped-off area west of #1 boiler where insulation was to be removed (Energy Systems). Three samples measured 0.02 to 0.09 asbestos…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…
-
Company document · Union Carbide documents
Kemron and JHM Laboratories Asbestos Air-Sample Analytical Reports for Union Carbide, Sistersville/Long Reach, WV (1986–1987)
Kemron analytical report no. 3389 to Union Carbide, Long Reach WV (Attn: Ken Williams), report date 07/14/86; fibers per filter for samples Z-8062 to Z-8233 and a blank Kemron analytical report no…