Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · May 3, 1985
M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)
Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…
-
Company document · Union Carbide documents · November 22, 1985
G. W. Phares to B. H. Avashia, M.D., and Others on Asbestos Monitoring at South Charleston Plant (1985)
Internal Union Carbide memo reporting asbestos exposure monitoring done on November 18, 1985 while construction employees stripped and bagged insulation from a tank at the South Charleston polyols unit. It states that all samples were below…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · October 6, 1986
V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…
-
Company document · Union Carbide documents · December 12, 1984
M. F. Stowers to G. W. Phares on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1984)
Internal memo reporting personal asbestos exposure monitoring on November 13, 1984 during stripping of about 100 ft of asbestos-containing steam line insulation at the Institute plant. It states that all four samples were well below the 2.0 fibers…
-
Company document · Union Carbide documents · May 16, 1985
M. F. Stowers to R. S. Howell on Asbestos Monitoring During Insulation Stripping at the Institute Plant (1985)
Internal memo reporting asbestos air monitoring done on May 7, 1985 while construction employees stripped about 200 ft. of insulation from 3 inch process lines near the Pesticide B Unit at the Institute plant. It states all samples were below the…
-
Company document · Union Carbide documents · October 7, 1986
R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)
Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…
-
Company document · Union Carbide documents · September 18, 1987
Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)
Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · October 7, 1986
A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)
Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Correction to Asbestos Monitoring in Gasket Shop, 512 Construction (1981)
A one-page internal memo stating that the writer's October 20, 1981 letter on asbestos monitoring in the Gasket Shop (512 Construction) contained an error caused by misinterpreting data from the 512 Industrial Hygiene group. It asks recipients to…
-
Company document · Union Carbide documents · April 16, 1986
V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)
Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…
-
Company document · Union Carbide documents · July 22, 1986
M. A. Patel to Distribution List on the Amended OSHA Asbestos Standard, with T. E. Hanning's Summary of Changes (1986)
A July 22, 1986 internal memo from Technical Center industrial hygienist Manhar A. Patel reported that OSHA had amended its asbestos standard and attached T. E. Hanning's summary of the changes. The summary covers the lower exposure limit,…
-
Company document · Union Carbide documents · July 23, 1987
Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)
Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Institute Plant Gasket Shop (1981)
Internal memo from Manhar A. Patel reporting area and personal asbestos air monitoring in the Construction Department gasket shop at the Institute Plant on October 2 and 9, 1981, with a results table attached. The memo says exposures above the 2…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · June 26, 1981
D. T. Watters to I. P. Blackwood et al. on Potential Health Risks of Insulation Materials (Perlite Insulation Specification 4) (1981)
Memorandum from D. T. Watters, June 26, 1981, on potential health risks of insulation materials Union Carbide Chemicals/Plastics Material Specification for Insulation 4M/4A/4SS (perlite), December 1980, pages 1-2 of 2