No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

41 results for “Union Carbide Corporation”, page 1 of 3

  1. Company document · Union Carbide documents · April 28, 1975

    Union Carbide Calidria Sales Call Reports, Price Report and Memo on GAF Corporation, with Press Articles on GAF's Sell-Off (1975-1981)

    …Dickson (filed 8/7/79): GAF's intentions on asbestos purchases and Atlas; call date partly illegible Table, 1978 and 1979 GAF Corporation purchases of Calidria asbestos by month, Long Beach and Vails Gate (G. L…

  2. Company document · Union Carbide documents · April 5, 1979

    Internal Memo to W. B. DeAtley, T. J. Kagetsu and R. W. Rebholz on Packaging of Calidria Asbestos Products (1979)

    Internal Metals Division memo, originating from the "Calidria" Asbestos department, proposing a meeting at the King City plant on April 25, 1979 to discuss packaging of asbestos products. It says the packaging "deficiencies" were not new, that DOT…

  3. Company document · Union Carbide documents · May 17, 1979

    Customer Complaint Report on Broken Bags and Dusty Rail Car, Michael-Walters Industries, Valier, IL (1979)

    A Union Carbide customer complaint report dated May 17, 1979, about a rail car of HPO grade asbestos (81,900 lbs in 35 lb bags) shipped from King City, CA on 4/4/79 to Michael…

  4. Company document · Union Carbide documents · January 26, 1973

    D. E. Furlani Trip Report on Inspection of Shrink-Wrapped Asbestos Pallets Shipped to Georgia-Pacific, Akron, New York (1973)

    Report No. 73-T-7 on a January 18, 1973 trip to the Georgia-Pacific plant in Akron, New York, to inspect a rail shipment of SG-210 asbestos on pallets, two of which were shrink-wrapped at King City. It describes the condition of each pallet,…

  5. Company document · Union Carbide documents · June 6, 1980

    P. R. Sherman and R. O. Marsten Trip Report on Asbestos Bagging Improvement at Bound Brook and Union Camp (1980)

    …NJ, and Union Camp's Lyndhurst plant. It describes why the Union Camp accumulator/loader was judged unsuitable for a dust-proof overwrap of asbestos bags at King City. It then lists the agreed program of…

  6. Company document · Union Carbide documents · August 21, 1970

    Paul W. McDaniel to J. A. Riddle on Air Sample Particle Counts at the King City Asbestos Mine (1970)

    Internal Union Carbide correspondence reporting particle counts from air samples taken at the asbestos mine near King City, at the bulldozer operator, front loader operator and pit floor around the grizzly. The writer stated that the…

  7. Company document · Union Carbide documents · October 20, 1976

    J. E. Walsh Call Report on Celanese Plastics (Bishop, Texas) RG144 Packaging Complaints, with R. O. Marsten's Visit Memo (1976)

    A customer call report (pp. 1-2) by salesman J. E. Walsh on an October 20, 1976 visit to Celanese Plastics in Bishop, Texas, about torn bags and loose fiber on RG144 asbestos shipments and the customer's air sampling during truck unloading. It is…

  8. Company document · Union Carbide documents · October 3, 1980

    B. L. Ingalls to W. B. DeAtley and J. J. Sibley on Air Monitoring After Clean-Up of Residential Sites in Greenfield, Lockwood and King City, with Myers to Adams on Monitoring Costs (1980)

    A four-page exhibit. Pages 1-3 are an October 3, 1980 internal memo from B. L. Ingalls with an attached excerpt of a revised post-clean-up air monitoring program for residential sites in Greenfield, Lockwood and King City, California. The memo…

  9. Company document · Union Carbide documents · November 27, 1973

    R. E. Byrne, Jr. Informal Report on TiO2 Contamination of RG-244 During the T-135 Plant Run (1973)

    Informal report describing TiO2 contamination found in RG-244 asbestos produced during the August 15-22, 1973 T-135 plant run at King City. It reports TiO2 levels up to almost 3%, no correlation between TiO2 content and thickening efficiency, sales…

  10. Company document · Union Carbide documents · October 10, 1979

    John L. Myers to Dr. F. J. Shortsleeve on Preliminary 1981 Calidria Asbestos Sales Estimate (1979)

    Internal memo from John L. Myers transmitting a preliminary 1981 sales estimate for Calidria asbestos, with a comparison of tons and dollars against 1979 and the 1980 budget. It discusses a price increase averaging 8.5% he hoped to implement for…

  11. Company document · Union Carbide documents · December 6, 1973

    B. L. Ingalls Project Report on Shrink-Wrap Packaging Tests for Calidria Bags and Pallets (1973)

    …tests, with Tables I and II, cost information and conclusions Union Carbide Films-Packaging Division sheet on pallet wrapping for outdoor storage, with outdoor exposure test charts Sample cost calculations for bag and pallet shrink-film

  12. Company document · Union Carbide documents · February 13, 1980

    Harrison B. Rhodes to J. L. Myers on EPA Information Gathering Orders Under TSCA Sections 8(a) and 8(d) (1980)

    …It states that the AIA/NA would make no substantive response to the 8(d) proposal, that the author planned no Union Carbide action, and that no commitments would be made without approval from UCC management.

  13. Company document · Union Carbide documents · April 5, 1979

    J. L. Myers to W. B. DeAtley, T. J. Kagetsu and R. W. Rebholz on Packaging of Calidria Asbestos Products, with 1976 Attachments (1979)

    April 5, 1979 internal memo from John L. Myers proposing an April 25, 1979 meeting at the King City plant to discuss packaging of Calidria asbestos products, citing DOT regulations and leakage from fill spouts and shrink-film packaging. Attached are…

  14. Company document · Union Carbide documents · October 29, 1979

    G. L. Vessels to J. L. Meyers Listing Asbestos Shipments to Harrisons and Crosfield, Portland, Oregon (1979)

    Internal correspondence from the King City office replying to a letter of October 23, 1979. It states that no asbestos was shipped to seven named companies, and it attaches listings of asbestos products (RG-244, RG-144, HPO, RG-100, SG-210) shipped…

  15. Company document · Union Carbide documents · April 19, 1979

    John L. Myers to W. G. Alesio, G. R. Bailey and Others on Strategic Planning for the Calidria Asbestos Business (1979)

    Internal memo from John L. Myers responding to a 4/3/79 memorandum from Bob Rebholtz on defining the asbestos business and industry. Myers described the Calidria business as mining, milling and marketing short fiber asbestos, said a single industry…

  16. Company document · Union Carbide documents · May 16, 1979

    E. J. Kleber Call Report and Customer Complaint Report on Michael-Walters Industries, Valier, IL: Broken Bags and No Inflatable Dunnage (1979)

    Customer call report dated 5/16/79 and a customer complaint report dated 5/17/79 about a rail car of HPO Calidria shipped from King City to Michael-Walters Industries in Valier, IL. The customer reported broken bags, restacking of pallets, a near…

  17. Company document · Union Carbide documents · April 29, 1980

    P. R. Sherman Design Memorandum on Asbestos Bagging Improvement at King City (1980)

    Design memorandum (Design Memo No. 1, Revision No. 0, File No. 11217) by P. R. Sherman on improving the bagging of asbestos shipments at King City, CA. It describes efforts to develop a dust-free bag with a better bag wrap and a bag closure system…

  18. Company document · Union Carbide documents · June 1, 1972

    Paul W. McDaniel to J. L. Myers on Asbestos Dust Exposure Study at American Biltrite, Los Angeles (1972)

    Internal Union Carbide letter from the Medical Department's industrial hygiene engineer reporting a May 24, 1972 air-sampling study at American Biltrite Co., Los Angeles, of asbestos dust exposure in vinyl floor tile production. It…

  19. Company document · Union Carbide documents · September 19, 1973

    G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report (1973)

    Internal memo from G. L. Dickson to J. L. Myers, with an attached report, summarizing a three-week visit to the King City plant in August 1973. It concluded that only a 5-10% increase in RG-244 production was possible from present facilities and…

  20. Company document · Union Carbide documents · September 10, 1980

    John L. Myers to G. R. Adams, F. J. Shortsleeve and R. W. Rebholz on the Calidria 1981 Sales Budget and Planned Price Increases (1980)

    Internal memo transmitting the 1981 Calidria asbestos sales budget for review and approval. It states that plant costs were estimated to rise 30% and that price increases were budgeted to recover part of the lost gross margin, and it lists eight…