32 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · September 12, 1986
C. P. Maxwell to Browning, Collins, Graham, Keller, Mills, Noble and Rucker Transmitting M. A. Patel's OSHA Amended Asbestos Standard Training Slides (1986)
A handwritten cover note dated September 12, 1986 from C. P. Maxwell forwards copies of overhead slides that Manhar Patel prepared and used in a training session for Services and Construction Department supervisors on the OSHA amended asbestos…
-
Company document · Union Carbide documents · October 26, 1981
E. L. Adkins to C. F. Morris on Asbestos Monitoring Data for Gasket Fabrication, Building 325, Institute Plant (1981)
Internal memo from E. L. Adkins (Industrial Hygiene) reporting asbestos air monitoring on October 6, 1981 in the gasket fabrication area of Building 325, Institute Plant, where an employee cut Garlok sheets into gaskets. One personal and one area…
-
Company document · Union Carbide documents · September 15, 1987
H. E. Rucker, Asbestos Exposure Monitoring at the Institute Plant Pipe Insulation Removal (1987)
Internal Union Carbide memo transmitting results of personal air monitoring during removal of asbestos insulation from about 180 feet of 6-inch product line in a trench at the Institute Plant. It reports that four of…
-
Company document · Union Carbide documents · October 6, 1986
V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…
-
Company document · Union Carbide documents · August 24, 1955
J. D. Young to K. B. Lanham on Dust Sampling of "Carey-Temp" Insulation Block Cutting (1955)
Internal Chemicals Division memo from Industrial Hygiene at the Institute Plant to the Insulation Fabrication Shop. It reported results of dust sampling done while a head grinder machine cut "Carey-Temp" insulation block. It said the health hazard…
-
Company document · Union Carbide documents · October 7, 1986
R. W. Gilbert to B. H. Avashia, W. L. Browning and Others on Asbestos Exposure Monitoring in the Institute Construction Storeroom (1986)
Internal Union Carbide memo reporting asbestos air monitoring done on August 19 and 26, 1986 in the Construction Storeroom, Building 2002, at Institute, while two employees dispensed asbestos gaskets. It describes the results, recommends HEPA vacuum…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores Building 330 (1976)
Memo reporting area and personal air samples for asbestos fibers taken on June 7 and June 16, 1976 at asbestos rope and gasket storage bins in Plant Stores Building 330, after questions from Plant Stores employees. Counts ranged from 0.0 to 1.0…
-
Company document · Union Carbide documents · September 18, 1987
Industrial Hygiene (EM&TS - HS&EA) to H. E. Rucker on Asbestos Exposure Monitoring During Pumphouse Pipe Stripping (1987)
Internal Union Carbide memo transmitting results of asbestos air monitoring done during removal of asbestos insulation from about 310 feet of pipe at the #1 Pumphouse and about 50 square feet from a reactor at Building…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Correction to Asbestos Monitoring in Gasket Shop, 512 Construction (1981)
A one-page internal memo stating that the writer's October 20, 1981 letter on asbestos monitoring in the Gasket Shop (512 Construction) contained an error caused by misinterpreting data from the 512 Industrial Hygiene group. It asks recipients to…
-
Company document · Union Carbide documents · April 16, 1986
V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)
Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…
-
Company document · Union Carbide documents · July 23, 1987
Industrial Hygiene to H. E. Rucker on Asbestos Exposure Monitoring During Pipe Insulation Removal at the Institute Plant (1987)
Internal Union Carbide memo reporting asbestos air monitoring on insulators who stripped about 195 feet of 3-inch steam line at the Institute Plant tank farm. It states that all personal samples were below the 0…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Institute Plant Gasket Shop (1981)
Internal memo from Manhar A. Patel reporting area and personal asbestos air monitoring in the Construction Department gasket shop at the Institute Plant on October 2 and 9, 1981, with a results table attached. The memo says exposures above the 2…
-
Company document · Union Carbide documents · June 19, 1986
V. E. Stover and M. A. Patel to F. R. Sunderland on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1986)
Internal memo transmitting results of personal air monitoring for asbestos on insulators at the Institute Plant, Building 20, on June 4, 1986, during removal of 60 linear feet of asbestos from a 6 inch line and replacement with Kaylo. Two of four…
-
Company document · Union Carbide documents · March 15, 1979
H. H. Frazier to Peter Barna on Use of AMATEX Asbestos Tape in Plant 512 (1979)
Memo from H. H. Frazier to Peter Barna on three brands of insulating tape used at the Institute Plant. It reports that AMATEX tape contained raw asbestos fibers including dust, cites measurements of 0.03 to 1.9 fibers per cc at the Technical Center,…
-
Company document · Union Carbide documents · April 29, 1987
V. E. Stover and H. J. Kimble to H. E. Rucker on Asbestos Exposure Monitoring of Insulators at the Institute Plant (1987)
Internal memo reporting personal air sampling results for two insulators who loaded bagged asbestos for disposal and patched a line at Building 2009 at the Institute Plant. The memo states both samples were below the 0.1 f/cc OSHA action level,…
-
Company document · Union Carbide documents · July 9, 1976
H. H. Frazier to P. H. Day on Employee Exposure to Asbestos in Plant Stores, Building 330 (1976)
Memo reporting area and personal air samples for asbestos taken in June 1976 in Plant Stores Building 330, where asbestos rope and metal-reinforced gaskets were stored and dispensed. It states that the results were within the new TLV of two fibers…
-
Company document · Union Carbide documents · October 20, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal Union Carbide memo transmitting results of area and personal asbestos air monitoring in the Construction Department gasket shop at the Institute Plant, sampled October 2 and 9, 1981. The memo states that exposure above the…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Cover Note and Data Sheet (1981)
A short cover note dated October 23, 1981 tells recipients to replace Patel's October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop because of a misinterpretation of industrial hygiene data. The replacement letter reports…