Company document · Union Carbide documents · August 14, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Insulation Removal from Fluid Bed Dryer at Texas City Plant (1985)
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, of planned removal of about 400 square feet of insulation from the fluid bed dryer at Bldg. 121 of the Texas City plant. It gives the schedule (after August 26, 1985, to be…
-
Company document · Union Carbide documents · July 23, 1985
J. B. Leverton to Texas Air Control Board on Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1985)
…under 40 CFR 61.146, of Union Carbide's plan to remove about 1800 square feet of asbestos insulation from steam lines and valves in Building 180 at its Texas City plant. Removal was scheduled from…
-
Company document · Union Carbide documents · January 31, 1986
A. P. Yalcinkaya to Texas Air Control Board on Notification of Asbestos Insulation Removal at Texas City Plant (1986)
Exhibit consisting of a handwritten fax cover sheet, a January 31, 1986 letter notifying the Texas Air Control Board of planned removal of asbestos insulation from four amine solution heat exchangers at the Texas City plant, and a blank…
-
Company document · Union Carbide documents · December 12, 1985
J. B. Leverton to Bill Stewart, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City Plant (1985)
Two letters from J. B. Leverton of Union Carbide's Texas City Industrial Hygiene department to the Texas Air Control Board under 40 CFR 61.146. The December 5, 1985 letter gave notice of planned removal…
-
Company document · Union Carbide documents · September 30, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Ceiling Tile Removal at the Texas City Plant (1985)
…40 CFR 61.146, that Union Carbide planned to remove about 700 square feet of 18-year-old ceiling tile from Building 89 at its Texas City plant between late October 1985 and October 31, 1985…
-
Company document · Union Carbide documents · March 14, 1986
J. B. Leverton to Bill Stewart, Texas Air Control Board, Notifying of Asbestos Insulation Removal at Texas City Plant, with Attached Renovation Notice Form (1986)
…the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos-containing insulation from conduit at Bldg. 57 of its Texas City plant between April 1 and April 11, 1986…
-
Company document · Union Carbide documents · April 8, 1986
J. B. Leverton to Texas Air Control Board (Bill Stewart) on Asbestos Insulation Removal Notification, Texas City Plant (1986)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from equipment in its plant at 3301 5th Avenue South, Texas City, Texas. It states that…
-
Company document · Union Carbide documents · January 31, 1986
A. P. Yalcinkaya to Bill Stewart, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1986)
…Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove about 300 square feet of insulation from four amine solution heat exchangers at Bldg. 57 of its Texas City plant. Removal was…