7 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · January 28, 1980
Handwritten Memo to A. S. Howard, C. E. Richards and R. S. Howell About a Mailing List Used for Plant Work (1980)
A one-page handwritten note on a preprinted Union Carbide memo form, dated January 28, 1980 and addressed to three recipients. It says that a Mr. Eatt (name uncertain) had already used a mailing list for…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · November 16, 1979
Ruth Clise to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)
Internal industrial hygiene report on a survey of October 26, 1979, measuring construction workers' exposure to asbestos fibers while insulation was stripped from an exhaust duct in the Building 704 Powerhouse. It reports that the dust was too heavy…
-
Company document · Union Carbide documents · June 2, 1977
J. P. Gregory to J. W. Biddle and Others on Asbestos Insulation Stripping and Air Sampling at the Institute Plant (1977)
Internal memo reporting air sampling done on May 26, 1977 while asbestos insulation was stripped from the dust collector on #2 boiler at the Institute Plant. It lists area and personal sample results, including 2.44 and 1.78 fibers/cc for personal…
-
Company document · Union Carbide documents · June 2, 1977
J. P. Gregory to J. W. Biddle and Others on Asbestos Insulation Stripping and Air Sampling at the Institute Plant (1977)
Internal memo reporting air sampling during the stripping of asbestos insulation from the dust collector on #2 boiler at the Institute Plant on 5/26/77. It lists area and personal sample results and concludes that one sample slightly exceeded the…
-
Company document · Union Carbide documents · April 16, 1980
Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)
Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)
Internal report on air sampling for asbestos fibers on October 26, 1979, while construction workers stripped and bagged insulation from an exhaust duct in Building 704 Powerhouse. It states that dust on the workers' breathing zone samples was too…