16 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents
Union Carbide Construction/Services Department Asbestos Insulation Removal and Disposal Supervisor's Reports (Plant 380 and related sites)
Ten completed Construction/Services Department Supervisor's Reports on asbestos insulation removal and disposal, plus a one-page 'Attachment A' report form. Each form records job location, supervisor, date, description, feet removed, employees…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · April 1, 1987
R. E. Coyne Handwritten Note on Asbestos Removal from a Dowtherm Line in a Pipe Rack at Building 9 (1987)
One-page handwritten note dated 4-1-87 on a Dowtherm line with asbestos material in a pipe rack on the south side of Building 9. It states that an enclosure was not feasible because pipe was in the way and a good seal could not be made, and it lists…
-
Company document · Union Carbide documents · November 29, 1983
Randy [surname unclear] to Manhar Patel on Scheduling 1984 Industrial Hygiene Monitoring for the Construction Department (1983)
A one-page handwritten note dated November 29, 1983, to Manhar Patel with a copy to Charlie Maxwell. It says a reviewer named Don had reviewed the 1984 I-H Program for the Construction Department and found it very good. He asked that time periods,…
-
Company document · Union Carbide documents
Insulation Asbestest Results Forms Logging Asbestos Spot Tests on Insulation and Other Samples (1986-1987)
A 34-page series of handwritten entries on a preprinted 'Insulation Asbestest Results Form'. Each entry gives a sample date, who submitted the sample, the sample source, magnesium and iron test results, the analyst's initials, and remarks. The six…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on how Construction Department employees would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It sets out eight action steps: EPA…
-
Company document · Union Carbide documents · April 23, 1986
Vance E. Stover to J. D. McCue on Asbestos Testing of Insulation Samples from Building 701 (1986)
Internal memo reporting test results for asbestos on samples taken from three lines with disturbed outer coating in the basement of building 701. It states all samples contain asbestos and lists handling precautions. A second page is an Insulation…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to J. W. Barna and Others on the Asbestos Insulation Removal Project at the Sistersville Plant Steam Plant and Monomers Unit (1984)
Memorandum documenting a January 5, 1984 meeting on how the Construction Department would remove asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action steps with…
-
Company document · Union Carbide documents · March 11, 1988
T. E. Hanning to Distribution on Need for Personal Protection When Cutting or Removing Asbestos-Containing Gaskets or Packing, with Attachments (1988)
A March 1988 "Business Confidential" memo from T. E. Hanning for the Asbestos Phaseout Task Group asked plant locations about monitoring data, written procedures, wetting and glove-bag use, and the need for personal protection when cutting or…
-
Company document · Union Carbide documents · February 1, 1982
M. E. Bell and G. W. Bott to W. T. Shelton: Asbestos Monitoring of Insulators Wheeler and Agosti at 704 Powerhouse (1982)
Two Union Carbide 'Industrial Hygiene Monitoring for Asbestos' forms dated Feb. 1, 1982 (Computer Ref. W-1274), reporting personal air samples taken 1/26/82 at the 704 Powerhouse while two insulators stripped insulation. The results…
-
Company document · Union Carbide documents · January 6, 1984
L. R. Noble to Distribution on Asbestos Insulation Removal Project, Steam Plant and Monomers Unit, Sistersville Plant (1984)
Memorandum documenting a January 5, 1984 meeting on precautions for Construction Department employees removing asbestos insulation from piping and equipment in the Monomers Unit and Steam Plant at the Sistersville Plant. It lists eight action items:…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on an Asbestos Update: Proposed EPA Ban and OSHA Exposure Limit (1986)
One-page memorandum "for your information" reporting that labor unions were endorsing a proposed EPA asbestos ban and contended OSHA's 0.2 fibers per cubic centimeter limit gave insufficient protection. It also summarized the proposed…
-
Company document · Union Carbide documents · January 19, 1984
M. A. Patel to M. L. Mills on Identification of an Unknown Material at the Institute Plant, with L. D'Esposito's IR Spectrum Memo (1984)
Internal Union Carbide correspondence from January 1984 about a white powdery material found oozing from the floor of the field toilet in the construction shop area at the Institute plant. An R/D memo reported an…
-
Company document · Union Carbide documents · April 28, 1988
T. E. Hanning to D. A. Boggs and Others on Procedures for Handling Asbestos-containing Gaskets or Packing (1988)
Memo reporting that the Manufacturing Council accepted an Asbestos Phaseout Task Group recommendation to stop purchasing asbestos-containing materials after January 1, 1989, with GRAFOIL as the designated gasket and packing replacement. It discusses…
-
Company document · Union Carbide documents · January 8, 1986
T. L. Collins to B. R. McMakin, R. W. Scoular and Others on Asbestos Removal Regulations (1986)
Internal Union Carbide Technical Center memo dated January 8, 1986, from T. L. Collins of Site Services to a distribution list on asbestos removal. It forwarded an item from the January 3, 1986, issue of Inside…