4 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 24, 1987
Kirk E. Martin to M. Hightower and K. Klyng on Pre-Demolition Walk-Through of Bldg 187 and #32 Boiler Turbine, Texas City (1987)
Letter from Kirk E. Martin reporting industrial hygiene concerns from a questionnaire and walk-through inspection before demolition of Bldg 187 and the #32 Boiler Turbine at Texas City. It reported no concerns for Bldg 187, a significant amount of…
-
Company document · Union Carbide documents · June 24, 1987
Kirk E. Martin to R. M. Arnold and M. Hightower on Pre-Demolition Walk-thru of the Phenolic Resins Unit, Texas City (1987)
Memo reporting industrial hygiene concerns identified from a questionnaire and walk-through inspection before demolition of the Phenolic Resins Unit at Texas City. It notes asbestos insulation on lines and vessels, states the company policy on…
-
Company document · Union Carbide documents · August 5, 1987
J. L. Pedraza to G. L. Rivera on Demolition Walk-Through Summary for Buildings B-21 and B-24, Texas City (1987)
Internal Union Carbide memo from the Texas City plant summarizing eight concerns raised during a walk-through of the B-21 area and B-24 columns before demolition, each followed by a response. Items covered PCBs…
-
Company document · Union Carbide documents · July 16, 1991
A. F. Jackson to J. A. Aaron and Others on the Texas Department of Health Inspection of Dykon Services at Texas City (1991)
Memo from A. F. Jackson describing a routine July 12, 1991 inspection of the Texas City plant by Barbara Key of the Texas Department of Health, directed at Dykon Services, Inc., the asbestos abatement contractor at Bldg 113. It reports that Dykon…