No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

3 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents

    Procedure for Removal of Asbestos Insulation, Memo to Plant Letter Lists A, B and C2 (undated)

    A one-page procedure sent to plant letter lists A, B and C2 on removing asbestos insulation. It sets minimum and maximum respirator and protective requirements, tied to OSHA limits, and rules for bagging, labeling and disposing of scrap insulation.…

  2. Company document · Union Carbide documents · November 3, 1972

    K. G. Brink to Plant Letter Lists: Procedure for Removal of Asbestos Insulation (1972)

    A two-page procedure sent to plant letter lists, signed by K. G. Brink, on removing asbestos insulation within OSHA limits. It sets minimum and maximum respirator and protective requirements, rules for bagging, labeling and disposing of scrap, and…

  3. Company document · Union Carbide documents · November 3, 1972

    K. G. Brink to Plant Letter Lists on Procedure for Removal of Asbestos Insulation at Seadrift (1972)

    A two-page procedure sent to plant letter lists on removing asbestos insulation. It sets minimum and maximum respirator and protective requirements tied to OSHA fiber limits, handling and disposal rules for scrap, and general considerations. It is…