35 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · November 1972
OSHA Reply to D. E. Deese on Asbestos Monitoring and Medical Exams, with Union Carbide Asbestos Insulation Removal Procedures and F. Williams Memo to R. J. Taylor (1972)
Compilation of four items: an OSHA letter replying to a Union Carbide industrial hygienist about the asbestos monitoring and medical examination requirements of 29 CFR 1910.93a; a Seadrift Plant procedure for removing asbestos insulation; and…
-
Company document · Union Carbide documents · 1981
H. E. Fritz, Regulatory Report: Occupational Health & Safety Highlights, Union Carbide Health, Safety & Environmental Affairs Department (1981)
A Union Carbide regulatory report summarizing OSHA developments for September and October 1981. It covers OSHA's priority list (including asbestos), inspection targeting, ethylene oxide, access to medical records, a North Carolina byssinosis compensation decision, the…
-
Company document · Union Carbide documents · April 4, 1983
T. L. Collins to C. W. Carman et al. Transmitting T. A. Lincoln's Memo on Reporting Occupational Illnesses on the OSHA 200 Log (1983)
A 4 April 1983 cover memo from T. L. Collins forwarded a 16 March 1983 internal memo from Dr. T. A. Lincoln, Corporate Medical Director, on reporting occupational illnesses. The Lincoln memo listed examples in seven OSHA 200 log categories,…
-
Company document · Union Carbide documents · December 20, 1983
Industrial Hygiene Monitoring for Asbestos: M. F. Stowers and M. A. Patel to W. T. Shelton, Personal Samples of Two Insulators in Bldg. 707 Cell 11 (1983)
Two industrial hygiene monitoring reports for asbestos, dated Dec. 20, 1983 (Computer Ref W-1508), covering personal samples taken 11/10/83 in Bldg. 707 Cell 11, first level. One sample for R. P. Hess measured 0.07 fibers/cc over 30 minutes, and one…
-
Company document · Union Carbide documents · April 20, 1983
Industrial Hygiene Monitoring for Asbestos: J. W. Greenlee Stripping Insulation from Hot Water Tank, to W. T. Shelton (1983)
Union Carbide industrial hygiene monitoring form reporting a 33-minute air sample taken April 6, 1983 on J. W. Greenlee in Building 709 while he stripped insulation from an old hot water tank. It records a…
-
Company document · Union Carbide documents · August 6, 1981
Industrial Hygiene Monitoring for Asbestos: R. E. Raines, Building 701 Storeroom, Report to W. T. Shelton (1981)
One-page Union Carbide industrial hygiene monitoring form for asbestos, dated August 6, 1981. It reports one 45-minute personal sample of 0.089 fibers/cc taken on August 5, 1981 on an insulator (R. E…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · September 2, 1982
Industrial Hygiene Monitoring Reports for Asbestos on Insulation Stripping in Building 707, to W. T. Shelton (1980-1982)
Five one-page 'Industrial Hygiene Monitoring for Asbestos' forms addressed to W. T. Shelton of the 704 Shop. They report air-sample fiber concentrations for workers stripping insulation from steam and Dowtherm lines in Building 707, with dates from…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)
Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Powerhouse Insulation Stripping, Bldg. 704 (1981)
Two industrial hygiene monitoring forms dated 4/22/81 reporting airborne asbestos sampling on 4/21/81 in the Building 704 Powerhouse while insulators stripped old insulation from about 17 feet of steam line on the #2 boiler. Page 1 reports a…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)
Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memo from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant third level and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. It reports high fiber levels in…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…
-
Company document · Union Carbide documents · July 12, 1982
Manhar A. Patel to A. G. Olds transmitting asbestos analysis data sheets for Loc. 380, Sistersville Plant (1982)
Letter from Manhar A. Patel to A. G. Olds of the Sistersville Plant sending computer data sheets for the analyses of three filter cassettes submitted for asbestos analysis on June 17, 1982, for Loc. 380. The attachments are an industrial hygiene…
-
Company document · Union Carbide documents · May 30, 1984
F. A. Sanchez to R. E. Peele and W. S. Walker on NESHAP Asbestos Standards Applicable at the 514 Plant (1984)
Internal correspondence from the Environmental Protection department sending a summary of the NESHAP asbestos standards (40 CFR Part 61, Subpart M) that apply to operations at Location 514, and asking recipients to pass it to the people responsible…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…