You don't need the product names or old records. No fee unless we recover compensation for your family.
Two pages of handwritten notes list numbered buildings (124, 221, 224, 422, Engineering Building, 259, a sunset hut, 166, 168 and one marked 511) with items such as insulated pipes or lines, ceiling tile, floor tile and furnace room. Most entries carry '#' numbers and 'Done' marks, and some carry dates of 10/22/90 and 10/23/90. The author, the purpose and the organization are not stated.
- Series
- Union Carbide documents, UC-1713
- Date
- October 1990
- Number
- Bates BRG 0391 to BRG 0390
- Library no.
- ACL Doc 16794 · asbestosclaims.law/library/16794
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-1713 · 2 pages · 44 KB
Related pages
Pages on our site about what this document covers: Asbestos Floor Tile, Sheet Flooring, and Black Mastic.
About this copy
This is document UC-1713 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 2 pages. Production numbers BRG 0391 to BRG 0390.
Cite this document
“Handwritten Checklist of Buildings with Insulated Pipes, Ceiling Tile and Floor Tile Marked Done.” October 1990. Union Carbide documents, UC-1713, Bates BRG 0391 to BRG 0390. AsbestosClaims.Law Library, ACL Doc 16794. https://asbestosclaims.law/library/16794.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.