You don't need the product names or old records. No fee unless we recover compensation for your family.
Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the scope, phases, OSHA/EPA compliance, schedule through December 1989, and cost estimate of $3.3MM capital and $1.4MM expense, with allocation to divisions.
- Author
- Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project))
- Published by
- Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering
- Series
- Union Carbide documents, UC-2149
- Date
- November 7, 1986
- Number
- Bates UCC 006704 to UCC 006712
- Library no.
- ACL Doc 17167 · asbestosclaims.law/library/17167
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2149 · 9 pages · 242 KB
What the document holds
- Page 1: Cover memo from Joseph F. Dodd to plant staff transmitting the Insulation Upgrade Outline of Project (Nov. 7, 1986)
- Page 2: Title page of Outline of Project, South Charleston Plant Insulation Upgrade
- Page 3: Table of contents
- Pages 4-5: Introduction, summary, sponsor's objectives, and facilities/phase schedule
- Page 6: Environmental protection, occupational health and safety considerations; supporting facilities
- Pages 7-8: Project plan, schedule, cost estimate, basis for estimate, and cash flow
- Page 8: Cost allocations to divisions
- Page 9: Appendix divider page (appendix contents not included)
People and organizations
From Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project)) to D. A. Gosselin; R. G. Link; S. Rossi (Assistant Plant Manager); M. J. Shoger; E. D. Southard; J. L. Worstell; W. D. Bradbury (cc).
- Joseph F. Dodd (author)
- D. A. Gosselin (recipient)
- R. G. Link (recipient)
- Sal Rossi (recipient)
- M. J. Shoger (recipient)
- E. D. Southard (recipient)
- J. L. Worstell (recipient)
- W. D. Bradbury, Jr. (copied)
- Specialty Chemicals Division (its organization)
- Union Carbide Corporation (its organization)
- Central Engineering Construction Group (named)
- Engineering, Manufacturing, and Technology Services (Union Carbide) (named)
- EPA (named)
- Maintenance Department (named)
- OSHA (named)
- South Charleston Plant Engineering (named)
Related pages
Pages on our site about what this document covers: EPA · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-2149 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 9 pages. Production numbers UCC 006704 to UCC 006712.
Cite this document
Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project)). “J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project.” November 7, 1986. Union Carbide documents, UC-2149, Bates UCC 006704 to UCC 006712. Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering. AsbestosClaims.Law Library, ACL Doc 17167. https://asbestosclaims.law/library/17167.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.