No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Asbestos Handling and Asbestos Removal/Disposal Checklists for Insulation Removal Jobs, East Tank Farm and Other Plant Areas (1985-1986)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A set of plant checklist forms recording jobs in which asbestos insulation was removed, mostly in May and June 1986, with a few forms dated May 1985. Each form gives the date, job description, estimated quantity removed, location (for example Area III, Zone C, Bldg. 174, East Tank Farm), the craftsmen involved, and yes/no checks for barrier tape, warning signs, protective clothing, respirators, wet-down, disposal and clean-up. Page 1 records 120 feet removed on 6-25-86, with 'Dumpster Sealed or Wet Down' marked No.

Author
L. W. Spangle (Supervisor (signature on the page 1 and 2 checklists))
Published by
Union Carbide Corporation (plant safety department forms; the plant is not named in the text provided)
Series
Union Carbide documents, UC-2283
Date
1986
Number
Bates UCC 002061 to UCC 002205
Library no.
ACL Doc 17275 · asbestosclaims.law/library/17275
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2283 · 145 pages · 4.4 MB

What the document holds

  • Pages 1-32: Asbestos Handling-Checklist forms for insulation removal jobs, dated about May-June 1986 (pages 1-2 dated 6-25-86 and 6-24-86), mostly East Tank Farm, Bldg. 174, plus pipe rack and Bldg. 151/223 jobs
  • Pages 33, 35-39: Maintenance Checklist for Asbestos Removal/Disposal forms (April 1984 form version), with a yes/no/N-A checklist and a list of people involved in the job
  • Pages 34, 40: Asbestos Handling-Checklist forms for small removal jobs
  • Page 141: Asbestos Handling-Checklist form, date and details largely illegible in OCR
  • Pages 142-145: Maintenance Checklist forms for stripping asbestos from Tank 4612/22 (Bldg. 36, May 1985); comments note laborers were given an asbestos safety review

People and organizations

From L. W. Spangle (Supervisor (signature on the page 1 and 2 checklists)) to Area Safety File (routing copy 1); W. C. Young (Safety Dept. (routing copy 2)); B. P. Johnson (Trucking (copy 3 on the Maintenance Checklist form)).

About this copy

This is document UC-2283 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 145 pages. Production numbers UCC 002061 to UCC 002205.

Cite this document

L. W. Spangle (Supervisor (signature on the page 1 and 2 checklists)). “Asbestos Handling and Asbestos Removal/Disposal Checklists for Insulation Removal Jobs, East Tank Farm and Other Plant Areas.” 1986. Union Carbide documents, UC-2283, Bates UCC 002061 to UCC 002205. Union Carbide Corporation (plant safety department forms; the plant is not named in the text provided). AsbestosClaims.Law Library, ACL Doc 17275. https://asbestosclaims.law/library/17275.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.