No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

F. A. Sanchez to R. E. Peele and W. S. Walker on NESHAP Asbestos Standards Applicable at the 514 Plant (1984)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Internal correspondence from the Environmental Protection department sending a summary of the NESHAP asbestos standards (40 CFR Part 61, Subpart M) that apply to operations at Location 514, and asking recipients to pass it to the people responsible for compliance and to send any written asbestos-handling procedures by June 30, 1984. The attached summary covers definitions, notification, emissions control during demolition and renovation, insulating materials, and disposal and container labeling.

Author
F. A. Sanchez (Environmental Protection (Originating Dept.), South Charleston Plant)
Published by
Union Carbide Corporation, South Charleston Plant, Silicones and Urethane Intermediates
Series
Union Carbide documents, UC-2315
Date
May 30, 1984
Number
Bates UCC 003105 to UCC 003108
Library no.
ACL Doc 17305 · asbestosclaims.law/library/17305
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2315 · 4 pages · 147 KB

People and organizations

From F. A. Sanchez (Environmental Protection (Originating Dept.), South Charleston Plant) to R. E. Peele; W. S. Walker.

Pages on our site about what this document covers: EPA · NESHAP · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2315 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 4 pages. Production numbers UCC 003105 to UCC 003108.

Cite this document

F. A. Sanchez (Environmental Protection (Originating Dept.), South Charleston Plant). “F. A. Sanchez to R. E. Peele and W. S. Walker on NESHAP Asbestos Standards Applicable at the 514 Plant.” May 30, 1984. Union Carbide documents, UC-2315, Bates UCC 003105 to UCC 003108. Union Carbide Corporation, South Charleston Plant, Silicones and Urethane Intermediates. AsbestosClaims.Law Library, ACL Doc 17305. https://asbestosclaims.law/library/17305.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.