No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

C. C. Neely Minutes of March 17, 1987 Task Group Meeting on Phaseout of Asbestos-Containing Materials, Chemicals and Plastics Group, with Handwritten Notes and March 2, 1987 Memo (1987)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Memo from C. C. Neely transmitting an executive summary of the March 17, 1987 meeting of the Chemicals and Plastics Group task group on phasing out asbestos-containing materials in the work place. The summary says no asbestos-containing products were to be purchased after January 1, 1989, and cites a shrinking supplier base due to liability insurance problems. The exhibit also holds handwritten notes, including a cost note dated 6 Apr 87, and Neely's March 2, 1987 memo calling the task group meeting.

Author
C. C. Neely (Central Engineering, Union Carbide Corporation)
Published by
Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, South Charleston, West Virginia
Series
Union Carbide documents, UC-2429
Date
April 6, 1987
Number
Bates UCC 015789 to UCC 015802
Library no.
ACL Doc 17408 · asbestosclaims.law/library/17408
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2429 · 14 pages · 447 KB

What the document holds

  • Page 1: Neely memo of April 6, 1987 (date partly cut off) with the executive summary of the March 17, 1987 task group meeting; handwritten routing and margin notes.
  • Page 2: Handwritten note headed 'T E Martin', dated 6 Apr 87, on an additional cost of about $8,000 (1 man-month labor, printing cost).
  • Pages 3-12: Handwritten notes, apparently the detailed minutes of the meeting, largely illegible in the OCR.
  • Pages 13-14: Neely memo of March 2, 1987 to the task group announcing endorsement of the phaseout program, reactivation of the task group, and a March 17, 1987 meeting.

People and organizations

From C. C. Neely (Central Engineering, Union Carbide Corporation) to S. W. Clark; G. B. Elder; R. W. Engle; S. S. Murphree.

Pages on our site about what this document covers: EPA · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2429 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 14 pages. Production numbers UCC 015789 to UCC 015802.

Cite this document

C. C. Neely (Central Engineering, Union Carbide Corporation). “C. C. Neely Minutes of March 17, 1987 Task Group Meeting on Phaseout of Asbestos-Containing Materials, Chemicals and Plastics Group, with Handwritten Notes and March 2, 1987 Memo.” April 6, 1987. Union Carbide documents, UC-2429, Bates UCC 015789 to UCC 015802. Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, South Charleston, West Virginia. AsbestosClaims.Law Library, ACL Doc 17408. https://asbestosclaims.law/library/17408.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.