You don't need the product names or old records. No fee unless we recover compensation for your family.
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5 µm/cc (92 min) and an area sample of 1.0 fibers >5 µm/cc (93 min) against an OSHA allowable of 2 fibers >5 µm/cc. The comments recommend continued use of protective clothing, respirators and gloves and wetting down the area while insulation is stripped.
- Author
- Mark E. Bell (Work by (industrial hygiene monitoring form)); Manhar A. Patel (Approved by)
- Published by
- Union Carbide Corporation, Industrial Hygiene Department
- Series
- Union Carbide documents, UC-2806
- Date
- April 26, 1982
- Number
- Bates UCC 024872 to UCC 024874
- Library no.
- ACL Doc 17681 · asbestosclaims.law/library/17681
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2806 · 3 pages · 110 KB
What the document holds
- Page 1: Typed industrial hygiene monitoring form W-1315 dated April 26, 1982: D. C. Shamblin, Bldg. 706, signed by Mark E. Bell and Manhar A. Patel
- Page 2: Handwritten copy of the same W-1315 form (dated 4-26-82) with the same results and comments
- Page 3: Another handwritten monitoring form, Computer Ref. apparently W-1315, with a different person monitored (name illegible); results and comments largely illegible in the OCR
People and organizations
From Mark E. Bell (Work by (industrial hygiene monitoring form)); Manhar A. Patel (Approved by) to R. F. Painter (Trlr. 5583); B. H. Avashia, M.D. (cc); G. W. Bott (cc); M. L. Mills (cc); L. R. Noble (cc); R. E. Peele (cc); E. C. Shipley (cc).
- Mark E. Bell (author)
- Manhar A. Patel (author)
- R. F. Painter (recipient)
- Bipin H. Avashia (copied)
- G. W. Bott (copied)
- M. L. Mills (copied)
- L. R. Noble (copied)
- Robert Eugene Peele (copied)
- E. C. Shipley (copied)
- Industrial Hygiene Department (its organization)
- Union Carbide Corporation (its organization)
- OSHA (named)
Related pages
Pages on our site about what this document covers: Air Sampling · Industrial Hygiene · OSHA.
About this copy
This is document UC-2806 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 3 pages. Production numbers UCC 024872 to UCC 024874.
Cite this document
Mark E. Bell (Work by (industrial hygiene monitoring form)), Manhar A. Patel (Approved by). “Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706.” April 26, 1982. Union Carbide documents, UC-2806, Bates UCC 024872 to UCC 024874. Union Carbide Corporation, Industrial Hygiene Department. AsbestosClaims.Law Library, ACL Doc 17681. https://asbestosclaims.law/library/17681.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.