No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

P. A. Schultz to W. Bosserman Enclosing the Bound Brook Asbestos Removal Procedure and Monitoring Data (1983)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A March 30, 1983 internal Union Carbide cover memo from P. A. Schultz (SHARE) to W. Bosserman at Sistersville enclosing the Bound Brook asbestos procedure, background on the program responding to a May 6, 1982 OSHA citation, and personal monitoring data. The attachments include the Bound Brook Plant 312 Asbestos Removal Procedure (MP-366.1) with hazard ratings and respirator requirements, program highlight sheets, and a computer printout of monitoring data.

Author
P. A. Schultz (SHARE, Specialty Chemicals Division (signature block; originating department SHARE))
Published by
Union Carbide Corporation, Specialty Chemicals Division
Series
Union Carbide documents, UC-2935
Date
March 30, 1983
Number
Bates UCC 016214 to UCC 016230
Library no.
ACL Doc 17789 · asbestosclaims.law/library/17789
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2935 · 17 pages · 654 KB

What the document holds

  • Page 1: Cover memo, P. A. Schultz to W. Bosserman, Asbestos Procedure, March 30, 1983
  • Pages 2-6: Bound Brook Plant monitoring data printout (1980 thru 1982) with contaminant readings, including asbestos removal jobs
  • Pages 7-11: Maintenance Procedure MP-366.1, Asbestos Removal Procedure, Plant 312 Bound Brook (revised 5/25/82)
  • Page 12: Addendum I: typical insulation removal jobs with hazard rating of 1 (sketches)
  • Page 13: Highlights of Asbestos Program (PAS/RK, 6/3/82)
  • Page 14: Points to Remember (EJB/RK, 5/25/82)
  • Page 15: Status of Asbestos Monitoring Program (WDN/RK, 5/20/82)
  • Page 16: Addendum I to MP-366.1 on hazard rating of jobs (WDN/RK, 5/20/82)
  • Page 17: Proposed Asbestos Program (PAS/RK, 5/10/82)

People and organizations

From P. A. Schultz (SHARE, Specialty Chemicals Division (signature block; originating department SHARE)) to Mr. W. Bosserman (Sistersville location); Mr. W. H. Barton (copy, letter only).

Pages on our site about what this document covers: New Jersey Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2935 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 17 pages. Production numbers UCC 016214 to UCC 016230.

Cite this document

P. A. Schultz (SHARE, Specialty Chemicals Division (signature block, originating department SHARE)). “P. A. Schultz to W. Bosserman Enclosing the Bound Brook Asbestos Removal Procedure and Monitoring Data.” March 30, 1983. Union Carbide documents, UC-2935, Bates UCC 016214 to UCC 016230. Union Carbide Corporation, Specialty Chemicals Division. AsbestosClaims.Law Library, ACL Doc 17789. https://asbestosclaims.law/library/17789.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.