No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and transite siding and roofing by an asbestos abatement contractor. It also sets out the environmental and safety procedures, including OSHA glove-bag removal, wet methods, disposal rules and an air-monitoring limit of 0.1 fibers/cc. Pages 9-11 are drawing sheets, and the approval signature page is on page 8.

Author
T. G. Huff (Project Manager, South Charleston Plant Engineering)
Published by
Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering
Series
Union Carbide documents, UC-3159
Date
September 1, 1987
Number
Bates UCC 000219 to UCC 000226
Library no.
ACL Doc 17994 · asbestosclaims.law/library/17994
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-3159 · 11 pages · 572 KB

People and organizations

From T. G. Huff (Project Manager, South Charleston Plant Engineering) to J. F. Dodd (Engineering Manager); D. J. McNeil; C. R. Rotthoff (SC Div Personnel Safety Manager); M. J. Sheger; D. R. Stokely; W. N. Stratton; J. L. Worstell (Environmental Protection Dept.).

Pages on our site about what this document covers: Asbestos insulation: pipe covering, block, and insulating cement · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-3159 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 11 pages. Production numbers UCC 000219 to UCC 000226.

Cite this document

T. G. Huff (Project Manager, South Charleston Plant Engineering). “T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant.” September 1, 1987. Union Carbide documents, UC-3159, Bates UCC 000219 to UCC 000226. Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering. AsbestosClaims.Law Library, ACL Doc 17994. https://asbestosclaims.law/library/17994.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.