No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report (1973)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Internal memo from G. L. Dickson to J. L. Myers, with an attached report, summarizing a three-week visit to the King City plant in August 1973. It concluded that only a 5-10% increase in RG-244 production was possible from present facilities and made five recommendations on supervision, labor, product specifications, process variables and the production circuit. The report includes RG-244 inventory and weekly production tables.

Author
G. L. Dickson (Mining and Metals Division, "Calidria" Asbestos)
Published by
Union Carbide Corporation, Mining and Metals Division
Series
Union Carbide documents, UC-3351
Date
September 19, 1973
Number
Bates UCC 009329 to UCC 009336
Library no.
ACL Doc 18137 · asbestosclaims.law/library/18137
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-3351 · 8 pages · 442 KB

What the document holds

  • Page 1: Internal correspondence from G. L. Dickson to J. L. Myers, Sept. 19, 1973, with five recommendations (UCC 009329)
  • Page 2: Title page of report 'Evaluation of King City RG-244 Production' by G. L. Dickson (UCC 009330)
  • Page 3: Report text: background, present production rates, supervision, additional manpower (UCC 009331)
  • Page 4: Table I: Calidria RG-244 inventory listing for 1973 by location (UCC 009332)
  • Page 5: Table II: Calidria RG-244 weekly production record, 1973
  • Page 6: Report text: manpower, product specifications, process variables, production circuit (UCC 009334)
  • Page 7: Report text: dryer downtime, Raymond mill, bagging tests (UCC 009335)
  • Page 8: Report text: procedures, product loss survey, rejected production; signed G. L. Dickson 9/19/73 (UCC 009336)

People and organizations

From G. L. Dickson (Mining and Metals Division, "Calidria" Asbestos) to J. L. Myers (UCC Mining and Metals, Niagara Falls, NY); R. E. Byrne, Jr. (copy); V. D. Holt (copy); R. J. Kronkhyte (copy); F. H. Larrison (copy); O. J. Malacarne (copy); R. O. Marsten (copy); H. B. Rhodes (copy); W. C. Thurber (copy).

Pages on our site about what this document covers: Calidria · California Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage · New York Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-3351 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 8 pages. Production numbers UCC 009329 to UCC 009336.

Cite this document

G. L. Dickson (Mining and Metals Division, "Calidria" Asbestos). “G. L. Dickson to J. L. Myers on Evaluation of the King City RG-244 Production Facility, with Attached Report.” September 19, 1973. Union Carbide documents, UC-3351, Bates UCC 009329 to UCC 009336. Union Carbide Corporation, Mining and Metals Division. AsbestosClaims.Law Library, ACL Doc 18137. https://asbestosclaims.law/library/18137.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.