You don't need the product names or old records. No fee unless we recover compensation for your family.
Internal Union Carbide correspondence dated February 19, 1987, in which J. E. Sanders told B. G. Perry that plans were being established to phase out asbestos-containing materials from C&P facilities. Clyde Neely was asked to lead the effort and to develop a plan covering the steps between then and January 1989.
- Author
- J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center)
- Published by
- Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center (South Charleston, WV)
- Series
- Union Carbide documents, UC-3824
- Date
- February 19, 1987
- Number
- Bates UCC 0012755
- Library no.
- ACL Doc 18478 · asbestosclaims.law/library/18478
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-3824 · 1 pages · 28 KB
People and organizations
From J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center) to Mr. B. G. Perry; Mr. P. D. Franson (copy); Mr. W. G. Lilly, Jr. (copy); Mr. C. C. Neely (copy); Mr. S. W. Turicchi (copy).
- J. E. Sanders (author)
- B. G. Perry (recipient)
- P. D. Franson (copied)
- W. G. Lilly, Jr. (copied)
- C. C. Neely (copied)
- S. W. Turicchi (copied)
- Central Engineering (named)
- Engineering, Manufacturing, and Technology Services (Union Carbide) (named)
- Maintenance Groups (named)
- Technical Center (named)
- Union Carbide Corporation (named)
Related pages
Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-3824 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 1 page. Production numbers UCC 0012755.
Cite this document
J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center). “J. E. Sanders to B. G. Perry on Asbestos Usage and Phase-Out Plans for C&P Facilities.” February 19, 1987. Union Carbide documents, UC-3824, Bates UCC 0012755. Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center (South Charleston, WV). AsbestosClaims.Law Library, ACL Doc 18478. https://asbestosclaims.law/library/18478.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.