No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

J. E. Sanders to B. G. Perry on Phase-Out of Asbestos-Containing Materials from C&P Facilities (1987)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Internal Union Carbide memo from J. E. Sanders to B. G. Perry, dated February 19, 1987, on the subject 'Asbestos Usage'. It states that plans were being established to phase out asbestos-containing materials from C&P facilities, that Clyde Neely was asked to lead the effort, and that a plan covering the period through January 1989 would be developed.

Author
J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center)
Published by
Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering Technical Center
Series
Union Carbide documents, UC-3827
Date
February 19, 1987
Number
Bates UCC 0012760
Library no.
ACL Doc 18481 · asbestosclaims.law/library/18481
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-3827 · 1 pages · 29 KB

People and organizations

From J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center) to Mr. B. G. Perry; Mr. P. D. Franson (copy recipient); Mr. W. G. Lilly, Jr. (copy recipient); Mr. C. C. Neely (copy recipient); Mr. S. W. Turicchi (copy recipient).

Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-3827 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 1 page. Production numbers UCC 0012760.

Cite this document

J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center). “J. E. Sanders to B. G. Perry on Phase-Out of Asbestos-Containing Materials from C&P Facilities.” February 19, 1987. Union Carbide documents, UC-3827, Bates UCC 0012760. Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering Technical Center. AsbestosClaims.Law Library, ACL Doc 18481. https://asbestosclaims.law/library/18481.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.