No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

J. G. Roy to T. G. Swanson on Asbestos Insulation Replacement at the No. 2 Steam Plant, South Charleston, with Attached Elimination Program and Related Notices (1984)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A December 27, 1984 memo from J. G. Roy to T. G. Swanson transmitted a proposal to phase out asbestos insulation at the No. 2 Steam Plant, South Charleston, with an attached 49-item work list. Later pages hold an April 1985 memo on protective gear for entering an asbestos removal area, a contractor's outline of OSHA/EPA-compliant removal procedures and air action limits, an April 1985 notice on a change of demolition safety watch, a table of figures, and handwritten notes.

Author
J. G. Roy (South Charleston Plant (Silicones and Urethane Intermediates))
Published by
Union Carbide Corporation, Silicones and Urethane Intermediates, South Charleston Plant
Series
Union Carbide documents, UC-4249
Date
December 27, 1984
Number
Bates UCC 011550 to UCC 011565
Library no.
ACL Doc 18840 · asbestosclaims.law/library/18840
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-4249 · 17 pages · 540 KB

What the document holds

  • Page 1: Memo, J. G. Roy to T. G. Swanson, Dec. 27, 1984, No. 2 Steam Plant asbestos insulation replacement
  • Pages 2-5: Asbestos Elimination Program, Building 151: general approach, schedule/funding, work assignments, project control
  • Pages 6-8: Attached work list of 49 items for removal from idle facilities and replacement with non-asbestos insulation (dated 12/28/84)
  • Page 9: Handwritten note on J. G. Roy 'From the Desk Of' sheet (mostly illegible)
  • Page 10: Memo, J. G. Roy to D. L. Burger and ES Supervisors, April 4, 1985, entry into No. 1 Steam Plant during asbestos removal; handwritten annotations
  • Pages 11-13: Affiliated Environmental Services, Inc. (Jack Dajich) outline of asbestos removal safety procedures, air monitoring and action limits, dated 4/2/85
  • Page 14: Memo, J. C. Cogar, April 3, 1985, change of demolition safety watch for insulation removal at Mainland Powerhouse
  • Page 15: Table of numeric figures (OCR garbled; appears to be a scanned table, possibly inverted)
  • Page 16: Handwritten notes (largely illegible)
  • Page 17: Page with no OCR text

People and organizations

From J. G. Roy (South Charleston Plant (Silicones and Urethane Intermediates)) to T. G. Swanson.

Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-4249 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 17 pages. Production numbers UCC 011550 to UCC 011565.

Cite this document

J. G. Roy (South Charleston Plant (Silicones and Urethane Intermediates)). “J. G. Roy to T. G. Swanson on Asbestos Insulation Replacement at the No. 2 Steam Plant, South Charleston, with Attached Elimination Program and Related Notices.” December 27, 1984. Union Carbide documents, UC-4249, Bates UCC 011550 to UCC 011565. Union Carbide Corporation, Silicones and Urethane Intermediates, South Charleston Plant. AsbestosClaims.Law Library, ACL Doc 18840. https://asbestosclaims.law/library/18840.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.