No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the scope, phases, OSHA/EPA compliance, schedule through December 1989, and cost estimate of $3.3MM capital and $1.4MM expense, with allocation to divisions.

Author
Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project))
Published by
Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering
Series
Union Carbide documents, UC-2149
Date
November 7, 1986
Number
Bates UCC 006704 to UCC 006712
Library no.
ACL Doc 17167 · asbestosclaims.law/library/17167
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2149 · 9 pages · 242 KB

What the document holds

  • Page 1: Cover memo from Joseph F. Dodd to plant staff transmitting the Insulation Upgrade Outline of Project (Nov. 7, 1986)
  • Page 2: Title page of Outline of Project, South Charleston Plant Insulation Upgrade
  • Page 3: Table of contents
  • Pages 4-5: Introduction, summary, sponsor's objectives, and facilities/phase schedule
  • Page 6: Environmental protection, occupational health and safety considerations; supporting facilities
  • Pages 7-8: Project plan, schedule, cost estimate, basis for estimate, and cash flow
  • Page 8: Cost allocations to divisions
  • Page 9: Appendix divider page (appendix contents not included)

People and organizations

From Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project)) to D. A. Gosselin; R. G. Link; S. Rossi (Assistant Plant Manager); M. J. Shoger; E. D. Southard; J. L. Worstell; W. D. Bradbury (cc).

Pages on our site about what this document covers: EPA · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2149 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 9 pages. Production numbers UCC 006704 to UCC 006712.

Cite this document

Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division (General Project Manager for the project)). “J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project.” November 7, 1986. Union Carbide documents, UC-2149, Bates UCC 006704 to UCC 006712. Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering. AsbestosClaims.Law Library, ACL Doc 17167. https://asbestosclaims.law/library/17167.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.