No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Industrial Hygiene Monitoring for Asbestos Reports to R. F. Painter (Shamblin and Templeton, Bldg. 706) and to W. T. Shelton (Greenlee) (1982)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Three Union Carbide industrial hygiene monitoring forms for asbestos at Building 706. Two, dated April 26, 1982, report air samples from insulation stripping on 04/21/82 for D. C. Shamblin (1.2 fibers >5 µm/cc personal, 1.0 area) and R. E. Templeton (0.9 fibers >5 µm/cc personal), against an OSHA allowable of 2 fibers. The third, dated March 9, 1982, reports a 15-minute personal sample of 0.53 fibers/cc for J. W. Greenlee.

Author
Mark E. Bell (Work by (signature block)); Manhar A. Patel (Approved by); Mario F. Stowers (Work by (third report, as printed in OCR))
Published by
Union Carbide Corporation, Industrial Hygiene
Series
Union Carbide documents, UC-2502
Date
April 26, 1982
Number
Bates UCC 024326 to UCC 024328
Library no.
ACL Doc 17479 · asbestosclaims.law/library/17479
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2502 · 3 pages · 118 KB

What the document holds

  • Page 1: Monitoring report (W-1315, April 26, 1982) to R. F. Painter for D. C. Shamblin, personal and area samples, Bldg. 706, UCC 024326
  • Page 2: Monitoring report (W-1315, April 26, 1982) to R. F. Painter for R. E. Templeton, personal sample, Bldg. 706, UCC 024327
  • Page 3: Monitoring report (W-1287, March 9, 1982) to W. T. Shelton for J. W. Greenlee, personal sample while stripping steam line insulation, UCC 024328

People and organizations

From Mark E. Bell (Work by (signature block)); Manhar A. Patel (Approved by); Mario F. Stowers (Work by (third report, as printed in OCR)) to R. F. Painter (Trlr. 5583); W. T. Shelton (704 Shop).

Pages on our site about what this document covers: Air Sampling · Asbestos Exposure in Insulators and Insulation Workers · Industrial Hygiene · OSHA.

About this copy

This is document UC-2502 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 3 pages. Production numbers UCC 024326 to UCC 024328.

Cite this document

Mark E. Bell (Work by (signature block)), Manhar A. Patel (Approved by), Mario F. Stowers (Work by (third report, as printed in OCR)). “Industrial Hygiene Monitoring for Asbestos Reports to R. F. Painter (Shamblin and Templeton, Bldg. 706) and to W. T. Shelton (Greenlee).” April 26, 1982. Union Carbide documents, UC-2502, Bates UCC 024326 to UCC 024328. Union Carbide Corporation, Industrial Hygiene. AsbestosClaims.Law Library, ACL Doc 17479. https://asbestosclaims.law/library/17479.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.