No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

9 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · March 26, 1980

    W. F. Blythe Jr. to W. T. Shelton on Asbestos Monitoring in Building 770 (1980)

    Internal Union Carbide memo reporting a March 19, 1980 survey of insulators' exposure to asbestos while removing asbestos insulation tape from tubing in Room 237 of Building 770. It states all samples showed less than 0…

  2. Company document · Union Carbide documents · January 9, 1979

    W. F. Blythe, Jr. to D. H. Cook, R. F. Painter, H. L. Robinson and T. W. Souder on Monitoring Insulators for Asbestos Exposure at Building 773 (1979)

    Internal memo reporting air monitoring of two construction insulators removing asbestos-containing pipe insulation on the third level of Building 773 on December 12 and 13, 1978. Exposures were 2.8 and 1.3 f/cc on the first day with little water and…

  3. Company document · Union Carbide documents · March 29, 1979

    W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute (1979)

    Internal memo reporting air sampling of construction insulators removing asbestos-containing insulation from a 3-inch steam line at the Institute, West Virginia, plant on March 17 and 19, 1979. It reported fiber concentrations of 0.7 to 3.4…

  4. Company document · Union Carbide documents · February 6, 1979

    W. F. Blythe, Jr. Report on Asbestos Monitoring of Insulators at Sevin Shipping, South Charleston (1979)

    Internal correspondence reporting personal and area air sampling for asbestos on January 22, 1979, while two insulators removed pipe insulation from flanges in the Sevin Shipping area (Building 233). It reported breathing-zone results of 7.75 and…

  5. Company document · Union Carbide documents · February 6, 1979

    W. F. Blythe, Jr. to J. Byrd and Others on Asbestos Monitoring at Sevin Shipping (1979)

    Internal correspondence from the Technical Center industrial hygiene group, dated February 6, 1979, reporting air monitoring of two insulators removing asbestos insulation from pipe flanges in Building 233, the Sevin Shipping area, on January 22,…

  6. Company document · Union Carbide documents · March 3, 1980

    Technical Center Industrial Hygiene Report on Asbestos Monitoring During Boiler Insulation Removal at Institute #2 Powerhouse (1980)

    Internal correspondence reporting personal air sampling of employees during removal of insulation from a boiler at the #2 Powerhouse at Institute, West Virginia, on February 20, 1980. Sample concentrations ranged from 0.2 to 0.8 f/cc, which the memo…

  7. Company document · Union Carbide documents · March 29, 1979

    W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal at Institute (1979)

    Internal industrial hygiene report on air sampling of construction insulators removing asbestos insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Personal samples ranged from 0.7 to 3.4 fibers/cc on…

  8. Company document · Union Carbide documents · June 8, 1979

    W. F. Blythe, Jr. to W. T. Shelton on Asbestos Monitoring During Insulation Stripping in Building 741 (1979)

    Internal Union Carbide Chemicals and Plastics report dated June 8, 1979 on personal and area air sampling for asbestos while an insulator removed wetted insulation from a valve in Building 741. It reported a time-weighted…

  9. Company document · Union Carbide documents · April 9, 1980

    W. F. Blythe, Jr. to D. L. Johnson on Asbestos Monitoring at Institute #1 Powerhouse (1980)

    Internal Union Carbide memo reporting an April 1980 air-monitoring survey of employees removing insulation from the #2 boiler in the Institute #1 Powerhouse. It states that personal samples ranged from 0.17 to 0.41…